Sky Voyager Ride Express line now up - also PSA engineering are working on it.
Locker Hire got a repaint and the tiles in the toilets were cleaned.
Cosentino stand in the Dreamworld Emporium.
Gates installed at the entrance of the park.
The train is being worked on to the left of Buzzsaw.
Crowds were good at Dreamworld today with even the rides being occupied. Sometimes people aren’t riding but are just there for Cosentino, but that wasn’t the case. The ride lines were good. Everything was running and I think they’ve really mastered peak and off peak periods. When the park is dead, a lot of things around Dreamworld are turned off. Today with good crowds, most rides were running, all the fountains were working and I couldn’t identify any cost cutting measurements. Only complaint is Buzzsaw is still unreliable and was shut for the day (while I was at the park). Other than that minor inconvenience and of course the train which comes out of maintenance next month, the park is running well.