  1. All of the work happens simultaneously. Pre-fab panels can be installed, while concrete is poured, while vehicles are tested off-site, while landscaping, electrical and plumbing go in, while a roof is installed. They're all different contractors working at the same time. If everyone needs 6 weeks to complete their part of the job, the area will be finished in 6-10 weeks - allowing some time for them to get out of each other's way (like installing wall panels before a roof). It is a lot of work, but it will come together pretty quickly. I'm just glad that DW are putting some effort into a car ride, and not just plonking down a rail. It will be nice to have a well-themed gentle ride that grandparents and young kids can ride together.
    3 points
  2. I saw 4 guys in Vekoma branded high vis gear wearing full harnesses walking towards Jungle Rush late this afternoon. I assume from their gear they were going to look at the turn table.
    2 points
  3. That means 6-10 weeks before testing starts? Having visited dreamworld last weekend. I struggle to see this being opened before February at the earliest. I hope I am wrong and they can pull some sort of miracle.
    1 point