Jump to content

New display name

Members
  • Posts

    7,413
  • Joined

  • Days Won

    210

Everything posted by New display name

  1. The white crane was inside the track for the temple build. It has now come outside the track for the station & plane build. The yellow crane moved the plane to the location and the bigger white crane, placed the plane in its final spot. The track has been removed for the crane to get out of the location it was in. The track might remain incomplete for a while, if the crane is still required for the temple.
  2. @Gazza The number of cycles is tracked from the commencement of commissioning. If people are saying the ride requires a block of 500 cycles before going into operation, I would like to know where they pulled that number from.
  3. Who cares if you can send a train every 3mins, because that isn't how the ride is commissioned and why the math is incorrect. Has nobody here read an operational manual? /s Sure, there are periods you cycle in blocks, but a lot of the times you are testing during the cycles. An example of a commissioning procedure. 1. Mark where empty train stops in station. 2. Complete (?) cycles. 3. Check empty train is stopping on the same marks. 4. Load train with dummies. 5. Complete (?) cycles. 6. Check loaded train is stopping on the same marks.
  4. Your math is way way off. You haven't allowed for any testing of the restraint system. Cycling the ride, isn't just hitting the green button.
  5. Scenic you mean theming? Leviathan was testing before theming was completed. It tested at night while building work continued during the day.
  6. @Brad2912 ShakeShack got the info from........................ Where all good info comes from.
  7. Jesus, hand your license in, if you think I'm changing lanes. I had no problem with MW's advertising and I knew what MW was selling. @Vidgamer @Levi @Park Addict 93all knew MW went cheap on adding new mazes. We get it ,your're standing up for an event you don't attend yourself. Makes no f^&king sense. 🙄
  8. You're making the assumption people who decided not to go, thought the entire night was going to be the same. MW advertised BJ and the horror encounters.
  9. There is no on the contrary, with what I said. Less people went because MW went cheap on new mazes.
  10. You would be wrong if you believe the track is complete. You know how the cars are going to operate & what keeps them powered up all day?
  11. Frome the outside, you just have to compare MW to DW construction photos, to see how far DW is behind MW. DW hasn't completed one building.
  12. DW ran a similar competition on the Thunderbolt. You slept on it and only allowed off for scheduled toilet breaks.
  13. First opening night, in the history of FN, opening night wasn't a sell out. Says volumes on what people want.
  14. @themagicianI'm even more worried. The level of theming DW promised us and bones of the ride still aren't completed. Track isn't completed, no building structure completed and let's not mention the whole ride system that needs to be installed. Some late night coming up for workers on this one to get it ready.
  15. DW have a great opportunity to light the creature up on top of the ride so it can stand out from the highway. Lasers shoot from out of the eyes, blowing up cars on the highway, during peak hour, is also acceptable.
  16. @Tricoart good job. Your guess of the ride rotating, turned out to be correct.
  17. More vehicles on tracks means more block braking systems, but one thing Scoobs already has, is a tone of brakes. I'm hoping they don't require extra block sections for the extra vehicles. I'm having thoughts but, the the new doors might be to hide a new block section.
×
×
  • Create New...

Important Information

By using this site, you agree to our Terms of Use. We have placed cookies on your device to help make this website better. You can adjust your cookie settings, otherwise we'll assume you're okay to continue.