New display name
Members-
Posts
7,413 -
Joined
-
Days Won
210
Everything posted by New display name
-
The white crane was inside the track for the temple build. It has now come outside the track for the station & plane build. The yellow crane moved the plane to the location and the bigger white crane, placed the plane in its final spot. The track has been removed for the crane to get out of the location it was in. The track might remain incomplete for a while, if the crane is still required for the temple.
-
Do we have gap filling? We are saved!
- 1,117 replies
-
- jungle rush
- vekoma
-
(and 2 more)
Tagged with:
-
Who cares if you can send a train every 3mins, because that isn't how the ride is commissioned and why the math is incorrect. Has nobody here read an operational manual? /s Sure, there are periods you cycle in blocks, but a lot of the times you are testing during the cycles. An example of a commissioning procedure. 1. Mark where empty train stops in station. 2. Complete (?) cycles. 3. Check empty train is stopping on the same marks. 4. Load train with dummies. 5. Complete (?) cycles. 6. Check loaded train is stopping on the same marks.
-
Somebody, Give that plane a Redbull!
- 1,117 replies
-
- 3
-
- jungle rush
- vekoma
-
(and 2 more)
Tagged with:
-
Jesus, hand your license in, if you think I'm changing lanes. I had no problem with MW's advertising and I knew what MW was selling. @Vidgamer @Levi @Park Addict 93all knew MW went cheap on adding new mazes. We get it ,your're standing up for an event you don't attend yourself. Makes no f^&king sense. 🙄
-
You're making the assumption people who decided not to go, thought the entire night was going to be the same. MW advertised BJ and the horror encounters.
-
There is no on the contrary, with what I said. Less people went because MW went cheap on new mazes.
-
First opening night, in the history of FN, opening night wasn't a sell out. Says volumes on what people want.
-
@themagicianI'm even more worried. The level of theming DW promised us and bones of the ride still aren't completed. Track isn't completed, no building structure completed and let's not mention the whole ride system that needs to be installed. Some late night coming up for workers on this one to get it ready.
-
Scooby Doo Spooky Coaster Overhaul
New display name replied to Spotty's topic in Theme Park Discussion
More vehicles on tracks means more block braking systems, but one thing Scoobs already has, is a tone of brakes. I'm hoping they don't require extra block sections for the extra vehicles. I'm having thoughts but, the the new doors might be to hide a new block section.- 256 replies
-
- 1
-
- scooby doo
- movie world
-
(and 1 more)
Tagged with: