
ShakeShack
Members-
Posts
269 -
Joined
-
Last visited
-
Days Won
8
Everything posted by ShakeShack
-
New Building behind Hollywood Stunt Driver
ShakeShack replied to themagician's topic in Theme Park Discussion
You're correct. -
Tropical Cyclone Alfred - Impacts on the Theme Parks
ShakeShack replied to themagician's topic in Theme Park Discussion
If people were still considering visiting the Gold Coast up until DW posting that they were closing, that level of stupidity is on them. Commonsense would say, don't visit due to the forecast, not what theme park announces their closure last... -
Considering the old Aqualoop tower, and multiple supports are still standing, I'd say the chances of new slides using the same tower/infrastructure are pretty high. Assuming they'd be White Water West slides if that's the case too.
- 49 replies
-
- 2
-
-
- wet n wild
- aqualoop
-
(and 1 more)
Tagged with:
-
Dreamworld Annual Passes - 2024 Price Increase
ShakeShack replied to themagician's topic in Theme Park Discussion
It feels like such a scummy thing listing the AfterPay pricing front and centre. -
Wizard of Oz - Movie World Arkham Asylum Replacement
ShakeShack replied to Park Addict 93's topic in Theme Park Discussion
This is correct, I have heard the same thing. -
There's a difference with running the exact same boat with different theming, than running a fundamentally different vehicle from what you intend on operating when open? The point is, Dreamworld's website is still saying "brand new vehicles" yet their CEO has said they're not getting new ones, besides 2 for accessibility reasons, and that they would just be rebuilding the current ones. What we're seeing in Ogre's photo is literally solidifying this point...
- 1,374 replies
-
- jungle rush
- vekoma
-
(and 2 more)
Tagged with:
-
It's almost like I flagged this a month ago, and was shut down as it being false. Wouldn't you do that with one of your new vehicles if you had them? Does not serve any good purpose running a different vehicle to what is intended.
- 1,374 replies
-
- 2
-
-
-
- jungle rush
- vekoma
-
(and 2 more)
Tagged with:
-
Movie World Scheduled Maintenance 2024
ShakeShack replied to themagician's topic in Theme Park Discussion
Total bullshit. -
Besides the corn, where are the fake plants at Oz?
- 1,374 replies
-
- jungle rush
- vekoma
-
(and 2 more)
Tagged with:
-
I don't think he/she is physically capable of such restraint.
- 1,374 replies
-
- jungle rush
- vekoma
-
(and 2 more)
Tagged with:
-
Dreamworld Maintenance Schedule 2024
ShakeShack replied to themagician's topic in Theme Park Discussion
Motocoaster has been pushed back again, this time until the 30th November. -
Generally nights are added for WC each year, after the announcement, depending on ticket sales, and aren't on the calendars above.
-
Wizard of Oz - Movie World Arkham Asylum Replacement
ShakeShack replied to Park Addict 93's topic in Theme Park Discussion
This is a great sign that we will be getting this entrance opened again! How good. -
I'd imagine that's possibly part of the reasoning as to them removing them?
- 49 replies
-
- wet n wild
- aqualoop
-
(and 1 more)
Tagged with:
-
As I understand it, bulk of the commissioning process takes place by the property. Manufacture runs the first cycles, before it's handed over to maintenance, and then to operations to complete the required cycles. Bulk of the work takes place by DW, hence my comment on them commissioning the attraction. Enough clarity for you champion?
- 1,374 replies
-
- 1
-
-
- jungle rush
- vekoma
-
(and 2 more)
Tagged with:
-
Mental gymnastics working hard here mate. I articulated what he said in the earnings calls. First as an approximation, then verbatim, both times were still not good enough.
- 1,374 replies
-
- jungle rush
- vekoma
-
(and 2 more)
Tagged with:
-
The discussion was regarding budgets, and the additional costs associated with conducting commissioning outside of standard hours. I proposed a question as to if this money was reassigned away from purchasing new vehicles for the attraction. I was then questioned and told that they are still getting new vehicles, contradicting what the CEO of the park had said. Regardless of the evidence presented, it was shutdown. That is all.
- 1,374 replies
-
- 1
-
-
- jungle rush
- vekoma
-
(and 2 more)
Tagged with:
-
It's called a discussion no? I couldn't care any less, than defending the statements that I made.
- 1,374 replies
-
- jungle rush
- vekoma
-
(and 2 more)
Tagged with:
-
How so? At no point does he say new (when talking about the whole fleet), he says rebuilt & rethemed. The only time he mentions new, is ONLY about the TWO wheelchair accessible vehicles. How does this fly in the face of those comments? Are you saying Greg is wrong in what he is saying? I've also contacted the park directly just now, they replied with: "We can't wait to welcome you on Murrissippi Motors when they open, though you'll have to wait a littleeee while longer for all the details. We promise it'll be worth it!" if they were still indeed new cars, you'd be articulating that to guests right, especially when it's mentioned on the website?
- 1,374 replies
-
- jungle rush
- vekoma
-
(and 2 more)
Tagged with:
-
To which part? Skirting around a lot of evidence for that reply.
- 1,374 replies
-
- jungle rush
- vekoma
-
(and 2 more)
Tagged with:
-
I'm literally articulating what the CEO has stated publicly?
- 1,374 replies
-
- jungle rush
- vekoma
-
(and 2 more)
Tagged with:
-
Completely different situation. If you're saying BRAND NEW VEHICLES, then they are new, from the ground up, not rebuilt. Are you saying that Dreamworld are that incompetent they've bought new vehicles with the wrong theme, and are needing to retheme them on site? If not, why would you mention "retheming"?
- 1,374 replies
-
- 1
-
-
- jungle rush
- vekoma
-
(and 2 more)
Tagged with:
-
See above. If you're building something new, are you rebuilding? If you've bought something new why are you "retheming"? Earlier in the year as I've stated, he says they're happy to announce they're building 2 NEW custom vehicles for accessibility. If you've purchase more than 2, why are you not spruiking that more than only mentioning 2 vehicles?
- 1,374 replies
-
- jungle rush
- vekoma
-
(and 2 more)
Tagged with:
-
Oh you mean like this one where Greg says they're building 2 custom vehicles? Does that mean we're only getting 2 vehicles on track? If you're building all new vehicles, you're not "retheming" something, are you? It would be new, so why would it be mentioned. Same goes for completely "rebuilding" them. If they're new, you're not rebuilding anything. https://portalapp.loghic.eventsair.com/VirtualAttendeePortal/algfy24hy/alg230224/ 24 minutes in. No assumptions here mate, just going off what I've heard/been told/seen in pressers.
- 1,374 replies
-
- jungle rush
- vekoma
-
(and 2 more)
Tagged with:
-
23 mins in, https://portalapp.loghic.eventsair.com/VirtualAttendeePortal/575858/680291/ "The ride vehicles are being rebuilt and rethemed, with two being designed for easy wheelchair access" The operator is the one to commission the attraction. Regardless of how you look at it, would you not agree that having to do this process in the hours in which they are, would not have been their first choice?
- 1,374 replies
-
- jungle rush
- vekoma
-
(and 2 more)
Tagged with: