Everything posted by Tim Dasco
-
2016 for Movie World
And the way they designed the original ride. I have not seen it in person only photos but it looks like there is no room to put DD in were it should be.
-
2016 for Movie World
With DD being added does anyone think we will see this being added into MW's Mini driving school?
- Dreamworld Q&A
-
Doomsday Destroyer - 2016 Movie World construction
Universal managed to do it and they have larger crowds than MW. They have done it with Diagon Alley and there is no sign even on the building that you have to walk through and this is to make it realistic. Plus US had attractions inside Diagon Alley. Photos from the outside of the entrance. and inside the "Portal"
- Doomsday Destroyer - 2016 Movie World construction
-
Tiger Island Refurbishment - Dreamworld 2016
It looks like they have sanded the varnish of the timber. Maybe they are going to put a more better seal or outdoor weather protection onto the timber to protect it from the water maybe.
-
Tiger Island Refurbishment - Dreamworld 2016
TTPSN stands for "The Theme Park Social Network".
-
Eureka Mountain Mine Ride reopening discussion
Nearly at the 10 year mark. We are currently at 9.62 years since it closed. Which means we are currently 20 weeks away until the 10 year anniversary of EMMR
-
2016 for Movie World
I love reading the Marvel agreements. I read somewhere can't seem to find it at the current moment it could be a rumour but Universal was not allowed to build any new rides themed to marvel. Thats why they completely rebuilt the Incredible hulk replacing the whole entire track and trains and called it a makeover.
-
Tiger Island Refurbishment - Dreamworld 2016
On the Shark Tank episode Sudden impact Entertainment who run ZE said that their contract with dreamworld had just been renewed for another year. But then again if they did film it at the end of last year. Which means dreamworld signed another year contract wouldn't work because ZE has not been open much this year because of the TI refurbishment and the Tiger Cub Kindy. But maybe their contract has changed and is now for a Sharknado unit to go to Dreamworld replacing ZE for one year after the TI has reopened. I did a little research and found some news articles that talks about the new shark that was joining in season 2. The article also says that filming was underway this article was from The Sydney Morning Herald. So filming did happen at the end of last year. Article link: http://www.smh.com.au/small-business/shark-tank-john-mcgrath-out-and-glen-richards-in-as-new-judge-20151103-gkpkh0.html
- Doomsday Destroyer - 2016 Movie World construction
-
Tiger Island Refurbishment - Dreamworld 2016
I read somewhere on Shark Tanks Facebook page someone asked how to apply to be on the show and the page said that filming was done at the end of last year for season 2 and they would have to wait for more info to come out for season 3. Anyway here is some images of TI construction for the great TTPSN. Looks like steel work is now full speed ahead and the stadium is starting to take shape.
-
Tiger Island Refurbishment - Dreamworld 2016
However that episode would have been filmed at the end of last year. Applications for Shark Tank season 2 where in August last year.
-
The Off Topic Topic
Not good news for Marchs Amusements.
- Doomsday Destroyer - 2016 Movie World construction
- Doomsday Destroyer - 2016 Movie World construction
- Doomsday Destroyer - 2016 Movie World construction
-
Luna Park Sydney confirms Tango Train closure
Could it be Pirates Revenge making a come back?
-
Tiger Island Refurbishment - Dreamworld 2016
Could we be seeing the Sharknado live attraction coming to DW?
-
Tiger Island Refurbishment - Dreamworld 2016
^ I was going to say the same thing. Lets hope the construction of Tiger Island moves into full speed.
-
Adventure World 2015 - 'Mi2' Kraken Tornado slide
My school is actually doing a live beneath the line whee you live on $1 a day for 2 days to raise money. However I have just dropped out of school and moved into TAFE to be a Sparky. So I can't take part.
-
Adventure World 2015 - 'Mi2' Kraken Tornado slide
I don't think the cold would be the main problem. I would say the rain would make it worse because once your cloths get wet they will stay wet and might lead to you getting hypothermia.
-
Traveling fairs!
Show West traveling Ranger. Well now Bells amusements Ranger, not LPS's Ranger.
-
The Off Topic Topic
Does he work at Dippin Dots?
-
Doomsday Destroyer - 2016 Movie World construction
It looks like they are in the process of putting a wall with the building background sticker between the two building to cover that gap. Hopefully it goes higher to cover the white big sheds side and continues to cover the SDSC sign area. It looks like it will go higher as the building in the picture is cut off and looks like it continues.