Jump to content

Naazon

Members
  • Posts

    1,455
  • Joined

  • Last visited

  • Days Won

    21

Everything posted by Naazon

  1. There are other practical effects that would look 1000% better and not be a fire risk, things like 'cold sparks' or properly insulating the area of the effect.
  2. Amazingly, I think I know him through work and he lives in Adelaide
  3. Sounds odd also, because the base of the GL ride area has potential to flood and with more rain on the way, not an ideal situation.
  4. Would it fit inside Superman? Phrasing, but what ever. Edit: Surfrider also has a 140cm height limit. Are their new restraints that could lower the height limit to 120~130cm?
  5. Just a visual warning of what happens when you build your house out of sticks/straw. the first 2 little pigs are idiots.
  6. Great update and photos. I know buddy site is likely a typo and you meant buggy, but it still kinda fits and I like it. I also hate how constrictor is alone in that splash zone. Such a big landing area for 1 slide, kinda disappointing.
  7. Yes, totally sure they use the same concrete mixture, construction methods and finish applied between flooring and high traffic walls.
  8. Personally I'm a pro Launcher. Give every launch a chance!
  9. Look, I don't think Disney is coming, but if they were to build here, the Sunshine Coast is an option. Plenty of land and also technically an international Airport (that would need major investment, but thats part of the Disney draw), otherwise Western Sydney with their new airport isn't a bad shout either. I can't see VIC, SA, NT or WA getting it over NSW (major population/tourism) and QLD (Tourism).
  10. We need a shovel emote for when people double down.
  11. I've personally never ridden a woodie, so I'm keeping quiet on that discussion. I love Superman, but its just too short for my liking. I wish it had another element or 2, which is why Rivals takes it for me. without being on ST at DW yet, GL takes #3 with JR #4, and I know many people hate GL but what ever.
  12. It's been 9 years, surely your NDA would have run its course? Mines is various but in reality about 4 years for financial data + legal agreements and contracts for a large, international inancial institution.
  13. The Domino's example is likely more of an attempt at humor than providing dumb instructions. The company wants to be trendy and cool.
  14. Increasing the cost will artificially create a ticket cap as people just won't go.
  15. It's actually likely because they are off the shelf TVs that they break so often. Household goods aren't supposed to run like that. Look up online the differences between a house hold TV vs Commercial TV / Display board. TLDW; Higher quality, designed for always on operation, cooling, simple/barebones OS
  16. No one observed one, and as far as I'm aware, most (all?) Mack rides aren't observed completing them either.
  17. If you didn't speak to Maintenance who provided that? Ride Ops? Secondly, does this mean the new stairs are installed and ect?
  18. How many NI Loops have Mack had to complete a pull through on? I lost count after 1. specifically, this time. Additionally, its all well and good Mack providing instructions, the crew on the ground need to be the ones who complete it, and they may not have been able to follow the steps/advice provided by Mack. There are 3 parties involved in this.
  19. Makes sense then. Thanks for researching more than I could be bothered.
×
×
  • Create New...

Important Information

By using this site, you agree to our Terms of Use. We have placed cookies on your device to help make this website better. You can adjust your cookie settings, otherwise we'll assume you're okay to continue.