Jump to content

Ash

Members
  • Joined

  • Last visited

Everything posted by Ash

  1. Yeah I returned to the same position as where I left which is good
  2. With the recent glues on MovieWorlds socials and all pointing to December 8, could today be a soft opening or more just an opening announcement?
  3. Seeing Greg serve drinks and food when Rivertown opened last year was refreshing too see, he and the team have definitely turned this park around and now with the theming on “just a flat ride” is second to none once again.
  4. What a great upgrade from the original Claw ride. The restraints are 100 times better with the air time feel being great to experience. The speed is on another level. Theming once again Dreamworld knocked it out of the park. As I’ve said previously, I’m excited for when they do a dark ride/water ride with the theming they can pull off.
  5. Was thinking the same, maybe a lighting package? But yeah looks the same. I’m very optimistic about the reveal too be honest
  6. Apparently there is and also a “wave lighting package” is or has been added for a wave like look at night time
  7. Now imagine what they can do on a dark/water ride in the future. They are definitely doing an amazing job as of late with the theming
  8. New signage has been installed on the Highway Dreamworld sign. Looks really good
  9. Did they really need to incorporate a loose item system? We didn’t have it before, hoping this doesn’t stuff up operation loading times as this ride is a people eater, this will just slow it down.
  10. Yeah Movieworld just posted it looks awesome
  11. Quite a funny little jab at MovieWorld within the King Claw theming, a ferry departure sign stating Village Road is closed for maintenance. 😂 seen it on Themepark Ogres video, also technical rehearsal signs are within the ride envelope. We could be riding very soon
  12. Yep 100% true, but the difference imo is Movieworld aim/claim to be the best park on the coast, pretty hard when as we all know most rides are closed at any given one time. Unfortunately with the company who now own Village parks, we the public will continue to suffer for their short comings.
  13. 😂😂😂 surprised? Movieworld needs to shut down for 6 months and spend some quality time fixing the place maintaining all their rides etc.
  14. Use the old Thunderbolt plot for a WWW expansion with a lazy river and a couple more slide towers. As Wikiverse said, Rocky Hollow needs to be replaced with a new water dark ride, Motorcoaster to be an expansion of Rivertown. The Gold Coaster to be replaced with a custom Flying coaster, imagine weaving in and out of WWW on a flying coaster? Would be an awesome experience.
  15. Can’t wait to see the congestion on the m1 once this is all said and done…
  16. The theming is looking good! Photo taken from Dreamworlds Facebook
  17. Mate I live in Ormeau, I know full well of the terrible traffic, it’s so bad now since when we built 6 years ago
  18. Nah forgot to count them when I was doing 110k on the M1, I’ll try tomorrow
  19. First up in the morning and back by 330, but most days I’m driving past numerous times to different jobs around the area over the last month or so
  20. I drive past both parks twice a day for work, Dreamworlds car park the last month or so has definitely been the busier out of the two, probably helps that the GC weather has been amazing for White water world too
  21. Drive past Movieworld yesterday around midday, only half the car park was full? Dreamworld was overflowing. Couldn’t see if Movieworld had some of the car park closed off but yes was definitely only half full when I drove past.
  22. I think Greg young and the team are not silly to simply retheme Motorcoaster, they know the operations and in general the ride is average. Once funds permit them to do so, a new attraction will replace it.
  23. It’s all the same, fake actors, I know they wanted down to earth people, but it won’t happen. The Gold Coast is full of influencers
  24. King Claw eyes were lit up this morning, looks a little lacklustre, hopefully more to come, eyes colour is a purplish colour.
  25. Supports and slide pieces are currently being installed for the new slide tower, crane has been on site all week.

Important Information

By using this site, you agree to our Terms of Use. We have placed cookies on your device to help make this website better. You can adjust your cookie settings, otherwise we'll assume you're okay to continue.

Configure browser push notifications

Chrome (Android)
  1. Tap the lock icon next to the address bar.
  2. Tap Permissions → Notifications.
  3. Adjust your preference.
Chrome (Desktop)
  1. Click the padlock icon in the address bar.
  2. Select Site settings.
  3. Find Notifications and adjust your preference.