Jump to content

Jesse_xaivier

Members
  • Posts

    13
  • Joined

  • Last visited

About Jesse_xaivier

  • Birthday 07/02/1996

Profile Information

  • Gender
    Male
  • Location
    Gold Coast, Australia
  • Interests
    Theme parks, motorsports and aviation.

Park & Ride Stats

  • Favourite Ride
    Hagrid’s Magical Creatures Motorbike Adventure

Recent Profile Visitors

The recent visitors block is disabled and is not being shown to other users.

Jesse_xaivier's Achievements

Newbie

Newbie (1/9)

  • Reacting Well
  • Collaborator
  • One Year In
  • Dedicated Rare
  • First Post

Recent Badges

0

Reputation

  1. Could just be using an old one to test the rails and not spoil the reveal of the new ones?
  2. Certainly not blaming anything, just stating it's existence really, yes it's been lower than normal this year and they have been lucky, but any rain day is basically a 0 progress day which is massive in the grand scheme. Let not forget its not just rain though and it's also difficult to operate a crane and manoeuvre large objects with increased wind speed which there has been no shortage of this year.
  3. I completely agree with you, and I hope that they can pull through on this one because it really won't look good for them. Just saying credit where credit is due, a lot of work has been completed in a short time frame, especially considering there has been some unfavorable weather at times.
  4. Just a reminder that the FIRST pieces of the temple structure steel frame went in mid April, they have since built an entire structure, fitted almost all external and internal panelling to the structure, layed coaster footings and installed an entire roller coaster track in just five months, these task being the likely most time consuming tasks to be completed. The remaining parts of the projects are likely much less time strenuous and will come together very quickly. Like it's been said on the thread before you can have multiple contractors working on various different parts of the project at a time, I'm personally confident they will have it done on their promised schedule (late December) based on the current progress.
  5. According to Intamin's technical data the 40 seat actually takes up less space, but even if that's a mistake, and they are around the wrong way it's only an extra six meters of required space, so could easily fit in it's current orientation or turned 90°
  6. I stand corrected, here's to hoping we still get some good air time.
  7. Looks to me installation hasn't finished and it still has it's mounting plates attached which are used to hold it in the delivery crates?
  8. Is it not a possibility that earth story weren't able to post any of their actual art as per agreements with Dreamworld until later agreed dates, so these were generated to post with a preliminary write up to put on the portfolio? This is a company that are masters at what they do, I'm sure there are some amazing art works done by them, just not ones that we are seeing/have access to.
  9. There's really not all that much to see, it's some pictures of the first pieces going in? The marketing team are probably playing the long game, you don't want to create too much hype too early or everyone will lose interest, smart if you ask me.
  10. Correct me if I'm wrong, but that appears to be a little guy 💁
  11. Looks like it will be for the entrance, photo op and loading platform for the ride.
×
×