Jump to content

2014 In Dreamworld - Tail Spin construction, Wipeout refurbishment, Triple Vortex construction


Recommended Posts

Thrillz Updates:

- Tail Spin: http://www.thrillz.com.au/tailspin-construction-9th-september/

- Throughout Dreamworld: http://www.thrillz.com.au/worlds-update-dreamworld-9th-september/

Tail Spin: The large plane has been put in place and the concrete has been painted blue.

Throughout Dreamworld: Cameras haven't been installed yet on GD. The timber walkway next to the GD (leading down to log ride) has been lacquered.

Link to comment
Share on other sites

The wipeout has emergency stopped 3 times today and ends up like you see in the pic... right after the slow completely horizontal flip... the ride is meant to start flailing around randomly... but the left arm loses power on the way up after the coming down from the slow-flip... its kinda hard to explain but it definatly looks like when I saw it happen twice that the left arm loses power cos the right arm keeps going half way up then it stops and levels out slightly but not completely... leaving the people swinging in the position In the photo...

post-29645-0-38407300-1410408070_thumb.j

Edited by BTTF Forever
Link to comment
Share on other sites

Guest
This topic is now closed to further replies.
 Share

  • Recently Browsing   0 members

    • No registered users viewing this page.
×
×
  • Create New...

Important Information

By using this site, you agree to our Terms of Use. We have placed cookies on your device to help make this website better. You can adjust your cookie settings, otherwise we'll assume you're okay to continue.