Here the transfer track is housed. The ride originally opened with 3 trains, but a 4th was added in 2015 to allow the ride to always operate at full capacity even if one train is undergoing maintenance.
Flying Turns
Flying Turns
4 July, 2015 by Gazza
Here the transfer track is housed. The ride originally opened with 3 trains, but a 4th was added in 2015 to allow the ride to always operate at full capacity even if one train is undergoing maintenance.