Here the transfer track is housed. The ride originally opened with 3 trains, but a 4th was added in 2015 to allow the ride to always operate at full capacity even if one train is undergoing maintenance.
Here the transfer track is housed. The ride originally opened with 3 trains, but a 4th was added in 2015 to allow the ride to always operate at full capacity even if one train is undergoing maintenance.