The trains on the ride went through several iterations to ensure safety and stability through the rapid fire turns. This was the primary factor in the delayed opening of the ride.

Flying Turns

Flying Turns

4 July, 2015 by Gazza

The trains on the ride went through several iterations to ensure safety and stability through the rapid fire turns. This was the primary factor in the delayed opening of the ride.

In this photo