After the loop the train heads up a second incline where a lift chain catches it. Again, it is towed to the top, released, then rolls through the course again in reverse.
After the loop the train heads up a second incline where a lift chain catches it. Again, it is towed to the top, released, then rolls through the course again in reverse.