At the bottom of the first drop is a transfer track. It is set for trains coming off the first drop to blow straight through and continue into the main layout.

Switchback

Switchback

3 November, 2016 by Gazza

At the bottom of the first drop is a transfer track. It is set for trains coming off the first drop to blow straight through and continue into the main layout.

In this photo