You can see in the background the transfer track used to shift trains onto the swing launch. The launch track is also in place, with the LSMs and the blowers used for the cooling system already fitted.

Steel Taipan

Steel Taipan

12 April, 2021 by Parkz

You can see in the background the transfer track used to shift trains onto the swing launch. The launch track is also in place, with the LSMs and the blowers used for the cooling system already fitted.

In this photo