The final turns and final brakes are done. The bit of galvanised steel track on the left is the maintenance bay / storage track.
Leviathan Construction
Leviathan Construction
5 June, 2021 by Parkz
The final turns and final brakes are done. The bit of galvanised steel track on the left is the maintenance bay / storage track.