The ride uses a switch track system to allow the train to travel in two directions on the launch track.
First the train rolls onto to the start of the launch track and then stops.
The ride uses a switch track system to allow the train to travel in two directions on the launch track.
First the train rolls onto to the start of the launch track and then stops.