The switch track then slides across, connecting the launch track to the section of track leading up the reverse spiral. The train launches immediately after it locks in place.
Steel Taipan
Steel Taipan
13 December, 2021 by Gazza
The switch track then slides across, connecting the launch track to the section of track leading up the reverse spiral. The train launches immediately after it locks in place.