The ride has had a chequered history. Within weeks of the ride initially opening in 2008 a car derailed then too. The manufacturer sought to rectify the issue, and the ride was reopened in mid 2009.
The ride has had a chequered history. Within weeks of the ride initially opening in 2008 a car derailed then too. The manufacturer sought to rectify the issue, and the ride was reopened in mid 2009.