The first half of the ride consists of an out and back layout, with several airtime hills and a hammerhead turnaround at the midway point.

Behemoth

Behemoth

19 January, 2015 by Gazza

The first half of the ride consists of an out and back layout, with several airtime hills and a hammerhead turnaround at the midway point.

In this photo