Essentially, a cable runs the length of the launch track, and the train hooks onto a "sled" linked to the cable.
Top Thrill Dragster
Top Thrill Dragster
20 February, 2015 by Gazza
Essentially, a cable runs the length of the launch track, and the train hooks onto a "sled" linked to the cable.