Photos Richard has uploaded
Here are all of the photos that Richard has uploaded.
The ground is prepared for concreting, and retaining walls constructed.
By the end of August, the rolling hillside had been dug out to accommodate the Kraken’s thrilling last dip into the run-out racing lanes.
Ground works started in mid-June.

Funfields is installing the Kraken Racer between the Alpine Toboggan Slide and the Go Karts. Balancing out the attraction concentration within the park.



The Tea Cup Ride is fenced off for maintenance work.

While in this transition period Wiggles World is looking quite bleak.

Many areas of cracked and worn pavement are getting long overdue repairs.

The Tea Cup Ride is remaining but is currently closed.

Much of the work also focuses on fixing and rejuvenating the very tired looking Wiggles World area.

Fun Spot will undergo retheming.

Much of Wiggles World is undergoing a retheme for the new area. Here we see the (closed) Yummy Yummy store – what once served "delicious fun and healthy choices" has been replaced by two junk food vending machines.

Concept art indicates that the area will be given a bright green flooring. Likely a soft rubber flooring as commonly found in playgrounds

The Bananas in Pyjamas Fun Maze takes shape, using the same bright fence paneling as the rest of ABC Kids World.

ABC Kids World extends the old Wiggles World area significantly.

Nothing like earthworks and rebar to get you excited about a childrens' attraction.

Behind the fencing we see everyone's favourite wildlife attraction, the Dreamworld river.

ABC Kids World is on track for a July opening. Because of the simpler nature and smaller size of children's attractions, the area will come together fairly quickly over coming weeks.

Bright fencing now lines the river and foundations are in place on either side of the pathway for the new area's entry signage. Let's hope they do something about the bitumen surface.