Everything posted by Naazon
-
Buzz off - Dreamworld commences dismantling of Buzzsaw roller coaster
Waiting helps with budgeting and tender processes. For sure the old needs to be removed first. Never implied otherwise but if you remove closer to the new installation you can package together the hires. If you remove first, if would be difficult to package the whole process as the new installation may not be for 3.5 years and rates surely will have changed by then. Not saying this is nice but it's business and as I said, Arkham isn't in the front of the park, it's hidden off to the side behind superman and Scooby buildings.
-
Buzz off - Dreamworld commences dismantling of Buzzsaw roller coaster
removal of Arkham will require cranes so may as well wait until the new ride is ready for construction. Not exactly awesome but luckily Arkham is tucked away behind some buildings and not literally front and center of the park.
-
Steel Taipan Construction - Dreamworld Mack launched roller coaster
WWF does really well too, I often see someone at the counter.
-
White Christmas 2021
Fully expect 12th, 19th, 23rd, 24th to open up on later dates too, as they start to sell out.
-
Dreamworld Maintenance 2021
- One Pass Price Rise
Lets just assume its closed and announce when its open.- Sea World Celebrates 50 Years
Eureka Mountain all over again.- Sea World Celebrates 50 Years
When I say recently, the paint isn't faded, peeling or dusty. Recently could have been 2 years ago but from what I was looking at, they looked fresh. And ontop of one of the stone pillars in the station is what appears to be a new bottle of mount franklin water, with their new bottle design/label (not sure how long ago it was introduced though). Would be tricky for a member of the GP to put that there, so people for sure have been in and around there and I doubt a cleaner would leave rubbish like that.- Sea World Celebrates 50 Years
They recently re-surfaced all the bridges over the Vikings troughs and the station looks like it had a quick once over clean. The roof beams look somewhat recently painted. Otherwise no word on it.- Sea World Spooky Nights
Look, compared to last years I don't think its anywhere near as good, but being realistic and completely honest it was a different style. It was really short (as they run it 3 or 4 times a night) There is a minimal firework and minimal pyrotechnic display. Essentially it was just a musical number (which was good) and a few water jets. The lights also weren't as good as last year. My theory is that they did a smaller/cheaper show scaled back due to covid limitations. If NSW was allowed up it would have been bigger/better. I'm not concerned and think this was just a dip in the quality. 2022 Seaworld will have new rides and I hope the monorail running, bringing a new vibe to it and Spooky Nights 2022 will be their biggest ever. Quick Edit: Captains Dinner was well worth the money. Good was nice, drink was good. A dedicated table and space away from crowds was awesome and super friendly staff- Electrical engineer saves thousands and pays off debts with theme park’s annual dining pass (Six Flags)
to be financially viable in Australia I assume the ticket cost would need to be an extra $150-200 each- Electrical engineer saves thousands and pays off debts with theme park’s annual dining pass (Six Flags)
https://www.news.com.au/finance/money/budgeting/electrical-engineer-saves-thousands-and-pays-off-debts-with-theme-parks-annual-dining-pass/news-story/200b813929826ce5c5b3d52a40584631 Honestly, I'm impressed.- Steel Taipan Construction - Dreamworld Mack launched roller coaster
So what you're saying now is the ride is designed to handle Cyclones?- Steel Taipan Construction - Dreamworld Mack launched roller coaster
They probably should since the GC can get cyclone speed winds and since 1970, 5 cyclones have passed through or near the GC Edit: Source - http://www.bom.gov.au/cyclone/history/tracks/beta/- Leviathan Construction Updates
- Dreamworlds 3D Map
Honestly the website should be backwards compatible. I'm using Version 94.0.4606.54 (Official Build) (64-bit) since I'm on a work controlled machine and they need to approve and push through updates. I also enjoy that the map is a mystery for me. A real hide and seek experience.- Dreamworld Maintenance 2021
So assume the other side will be going down for replacement once the West side opens?- Steel Taipan Construction - Dreamworld Mack launched roller coaster
I dunno if this was ever discussed but apart from the stupid Australian sun ruining this, i would have loved the exit of LW/AA to have been the entry.- FearaPhobia
My mates band is playing a set at FearaPhobia on the 30th? Not my thing so sounds a bit odd having them play but Fumarole are a solid band so if you're there on the 30th check em out.- Leviathan Construction Updates
Unlikely. I've tried many times but I just can't seem to get grass and trees to grow on my concrete slab out the back so I doubt Seaworld will be able to do the same. Also that concept art is out of date. Yes sorry I should have mentioned, its the Maintenance shed and can clearly see that when at the park since the coaster goes next to it and not into it. If they want to hide it, I think some wooden cladding could do the trick quite easily. From within the Nick area its not particularly visible as the trees/hedges are quite mature in that space. Also there is a massive wooden coaster next to it that kinda draws your attention anyway. It was super visible from the Tavern though. Off topic side note, I really enjoyed the Captains Dinner at Spooky Nights. Well priced and really attentive staff and just good to get away from crowds and chill out for a bit.- Leviathan Construction Updates
- Dreamworld suing engineer who certified fatal Thunder River Rapids ride
The fact DW (likely their insurance) is suing someone means they have chalked this one up to human error also. The human errored in not making the rides safety up to standard.- Sea World's dormant beast: up close with the Leviathan wooden roller coaster
Could be really pessimistic but I took that as they saw the negative feedback from Vortex and decided to hold off and work more on theming / landscaping and have to wait until the next budget release. Still no view of the front of train, but kinda understandable. They want to keep some secrets.- Happy Halloween 2021
The Stadium example is horrible. I've seen the ticket booths at Suncorp fail and they enter 20,000+ people in 15 minutes. It helps that they have 4 main entry gates with around 15-20 turnstiles at each gate.- TOT2 track removal
Nah you've come too far. - One Pass Price Rise
Important Information
By using this site, you agree to our Terms of Use. We have placed cookies on your device to help make this website better. You can adjust your cookie settings, otherwise we'll assume you're okay to continue.