Everything posted by Tinter
- Rocky Hollow Log Ride Demolition - Dreamworld
-
Steel Taipan Construction - Dreamworld Mack launched roller coaster
This. The envelope for rivals is long and that thing moves fast
-
Steel Taipan Construction - Dreamworld Mack launched roller coaster
Murdoch would never lie to me like that!
-
Dreamworld’s BuzzSaw is Retiring
Don't worry, that tower will be there eventually
-
Dreamworld’s BuzzSaw is Retiring
It's classified as a marshland or swampland so it theoretically can be built on but the costs involved in approvals and actually getting it workable would outweigh any value in doing it. Unless Ardent have lots of spare money to throw around, I doubt we'll see anything done with the island. Also redevelopment would be different as that whole area would be drained, filled, flattened and settled before houses begin going up.
-
Steel Taipan Construction - Dreamworld Mack launched roller coaster
Holy shit, some on topic content! Some sexy on topic content too
-
Dreamworld’s BuzzSaw is Retiring
Only if it uses the full length and we get a 300-400ft coaster $2 per 100g bag of Turtle feed that costs them $10 per 20kg
-
Steel Taipan Construction - Dreamworld Mack launched roller coaster
Some cheap vines aren't that expensive. Hell, steal some passionfruit cuttings and that whole fence will be smothered in a year
-
Steel Taipan Construction - Dreamworld Mack launched roller coaster
I really hope they run some greenery and vines along that prison fence
-
Dreamworld’s BuzzSaw is Retiring
Nah, they just winched it around the track twice without going through the station. They then evac'd them from the vertical lift hill for that authentic Buzzsaw experience
-
Steel Taipan Construction - Dreamworld Mack launched roller coaster
Not a full launch but a "hey, it's in technical rehearsal, come check it out" launch
-
Steel Taipan Construction - Dreamworld Mack launched roller coaster
They are really pushing for that September school holiday window. Meanwhile Leviathan is struggling for Easter
-
Steel Taipan Construction - Dreamworld Mack launched roller coaster
Pretty sure it's at the manufactures discretion now
-
Movie world Maintenance 2021
But will they be replaced with 2D ones, that's the real question
-
Steel Taipan Construction - Dreamworld Mack launched roller coaster
Computers are great but nothing beats a big piece of plywood with bits that can scratch/break off if they come even close to any objects in the possible reach of the tallest person who can ride
-
Dreamworld’s BuzzSaw is Retiring
TOT was actually pretty fun though. Even while on life support
-
Steel Taipan Construction - Dreamworld Mack launched roller coaster
That's definitely the non spinning train. It's on the track first so that it can be used for any pull throughs or initial testing. Then it'll be parked in the maintenance bay and the spinning seat train will be added to the track.
-
Movie world Maintenance 2021
Village don't understand that 'old' doesn't always equal 'needing replacement'
-
Movie world Maintenance 2021
I believe there was also a lot of track work that went on too. Including a complete refurb of the brakerun
-
Movie world Maintenance 2021
Let's just hope the new brakes don't feel like hitting a brick wall
-
Dreamworld owner Ardent leisure HY21 results reveal $83.6 million loss
>Gets $70m loan from government >Reports $83m loss Whoops