Everything posted by themagician
-
Movie World Fright Nights 2016
I don't know if people already know, but how will the new buildings for the new mazes will be accessed during FN. I'm thinking that it would either be via Villains Unleahed (depending on if there is still access through that back left corner) or AA. I feel like AA would be the smartest option, through the gate in the corner (next to SDSC). If so, I think the courtyard space of AA would make a great scare precinct.
- Doomsday Destroyer - 2016 Movie World construction
-
2016 for Movie World
-
Wild West Falls Refurbishment
-
2016 for Movie World
-
DC Rivals HyperCoaster construction discussion
- Movie World Fright Nights 2016
- Doomsday Destroyer - 2016 Movie World construction
-
Latest Nearmap images of the parks
There last updates for the GC were back in May, and Perth's last update was in June. But here is what you asked for: MW: DW: AW:
- Doomsday Destroyer - 2016 Movie World construction
- Doomsday Destroyer - 2016 Movie World construction
-
Doomsday Destroyer - 2016 Movie World construction
Thanks TPG. This ring in my opinion is definitely going to add that extra touch to the ride. After seeing the ring on other versions of the ride, I thought it was going to be pointless for DD, but now I'm happy they are putting it in. The shop is looking really good now, particularly with the windows now in, and I love the effect they've added with brick crumbling away at the front. And with those small slabs at the exit of the ride, do people think maybe they will add a couple of figures of the super Villian's? Maybe that pipe will provide a water effect, or a light or movement element to the character?
- Doomsday Destroyer - 2016 Movie World construction
- Doomsday Destroyer - 2016 Movie World construction
-
Doomsday Destroyer - 2016 Movie World construction
I think that way would be unfair. Having people walk up to the enterance, ready to ride, and a staff member says, sorry you can't ride it because you don't have this pass. If they did the way I said by letting them into the park early, then when the park opens at 10, the ride can be open to the public. And just do this during its soft opening.
-
DC Rivals HyperCoaster construction discussion
http://www.goldcoastbulletin.com.au/lifestyle/new-roller-coaster-hotel-and-lakeside-attraction-planned-for-movie-world/news-story/9e19ae24ce65872c5898781504b833fa I'm fairly sure this has been posted on here before, but can't remember, so thought I'd post just in case. I'm assuming that carpark fronting the road is that small gravel section just to the right of the road leading to AOS. So my thoughts now are that the TopGolf will go alongside the entrance road to MW, the hotel to the left at the front. And the coaster in the swap area.
-
2016 for Movie World
^Yeah, I didn't think it would be anything major, maybe they've put it there to let the dead grass grow a little.
-
2016 for Movie World
- dreamworld or movieworld
-
Doomsday Destroyer - 2016 Movie World construction
Nickelodeon Land did have delays during construction and the GL were complaining it wasn't open in time for the beginning of holidays, so they didn't delay its opening even more. I wonder how they'd go about only allowing Premier & Elite members to experience the area first. Could it just mean that they let these pass holders into the park early, and they have access to Villains Unleashed area?
- Doomsday Destroyer - 2016 Movie World construction
- Doomsday Destroyer - 2016 Movie World construction
- Doomsday Destroyer - 2016 Movie World construction
-
Sea World updates 2016
Roof is nearly complete, with facades really starting to come together. Vegetation is also now being up in place. And the Humpback and been moved from the usual spot:
- Doomsday Destroyer - 2016 Movie World construction