Skip to content

themagician

Members
  • Joined

  • Last visited

Everything posted by themagician

  1. ^That does seem very likely. The entry would be through that gate at the end of the path past JL. And that area seems like a decent size for a coaster. But I think it would be nice to see a coaster themed to something other than superheroes. Don't get me wrong, I won't complain if it is. I welcome all new rides if done well and I enjoy superhero films, but if I was put behind the show stage, it would likely be themed to the western area, and that would good to have in the park, in my opinion.
  2. Just been to DW and these posts have been put almost all the way around, at this point I can't figure out what it's going to be, I'm imagining a fence, but not sure how that will work with the space. There were also quite a few workmen walking in and out of the Kevin hill building. Im thinking once the Cubs can move into the main enclosure this whole corner of the park will he fenced off so major works can begin.
  3. ^Im fairly sure he said that this year it's a thrill ride and next year is the coaster.
  4. Please don't leave us hanging. If you can't say what it is, then in future (this has happened in the past before) we recommend that you don't say comments like this one. Just a new user tip.
  5. Despite dmh being new to the forums, I 100% believe the part about WWF. It's closed 13th June to 28th August which is a large amount of time to get a mountain repaint and special effects overhaul done. I'm hoping they introduce some new ones, and put them in the places where some have been removed and are now kind of dead space. And September opening and it not being a roller coaster I believe. Since they are opening a coaster as well, I'm going to say that not long as this new ride opens, they will begin construction for the coaster, which will use the sound stage (for the queue and station) and then the main section of track would be behind it and it would open in either September or December (depending on how big of project it is) next year.
  6. But the enterance may be from Tiger Island side. Or maybe the front of Kevin hill will be another enterance to Tiger Island.
  7. You were already in a deep sleep at 9pm? I am impressed that you were able to type that while sleeping walking, and then to get up again and reply. Well done.
  8. If POP was more reliable then I would believe this, a part from the name. Not saying that the pricing part isn't true, I'd believe that, particularly when it's supposed to be the worlds best. Wait and see. As said in the latest Parkz News, maybe they are going to announce something early March, once new passes are available.
  9. I'd say that set was removed years ago, and that's how a FN maze fits in.
  10. I was there this morning as well. And could see inside the building and it's looking pretty empty. I'm not sure if there was things being stored inside it before construction work began, but now it looked like it is. Just a couple of off topic comments that I've never noticed this morning. When on SE, just before you go through Metropolis Station in what I thought was a theme-less section of track I noticed themed pipes hanging from the roof that were separated (as if the gas had blown from them), and there was sound playing as if the gas had blown. Either this has just something that hasn't been turned on when I've ridden it, or I've just never paid attention to it. Also, regarding WWF behind the inside section of queue, there is a door at the back (which I've noticed before), but behind it (which you can only see once on the ride), is an outdoor section of queue covered by a shade sail, and it was quite a large space. Just out of curiosity, does one know when this section of queue was last used, or is has it not been used for years now as the ride doesn't get as long of queues as it did when it first opened?
  11. ^The Coomera exit is even worse, and causes queues from every direction, mainly due to the amount of schools in the area. And I'd say this exit is the main one used for DW anyways.
  12. Prayer room is now gone. Im thinking these buildings could be all down by the end of the day. (Photo: TPSN)
  13. That makes sense if they are doing this ride. And would look better in the park, raher than 2 tower rides right next to each other.
  14. ^I did think that, why another tower ride. But if it provides a completely different experience, then there is no reason not to. And he is a villain in the DC comics. If that is the ride, that would explain SE maintenance schedules. Also, the demolition continues (TPSN)
  15. Got a pass and went to DW for the first time in a couple of years (except for night events). Park is looking good. Checked out MS, and I thought Brock's garage was done well, just isn't overly popular. And the HWSW has much more comfortable seating (with room to put my legs now) and better brake and lift hill system. The track was still rough, but didn't find my head banging against the restraint. I do think in the queue line that some netting should be put around the top between the walls and shading, as birds are getting in and crapping on the tower.
  16. ^Im going to assume it's because of the Cubs.
  17. I never got to do ZE, but always enjoyed the AvP. It was a good attraction, and as already stated, something people wanted to do have go at. I am pleased that TI is getting a refurbishment. Hopefully it's what was supposed to happen last year, with seating for crowds to make watching the talks easier. It would have been great if DW did use the building for a dark ride, but I'm not complaining. There is are a number of other spaces that could be used for a dark ride.
  18. It just seems compared to previous years, there is more theming. And is this the first time they've had the CNY theming added to the enterance logo?
  19. MW have put up a Chinese New Year themed sign out the front and another one of those rooms on Main Street. Could this be another evening event (maybe just on CNY) or just an extra thing throughout the day. Photos: TPSN
  20. ^Generally track and supports won't arrive on site until they're needed. Once the ground work is complete then supports will arrive and be installed, and then as that nears completion, the track will arrive and then be installed. I don't think we need to worry about them being behind or anything. We don't even have an opening date or even what it is yet. I'm hoping for a January opening, but that all depends on how big and how much work needs to be done. Despite nothing being confirmed, except that MW are getting a roller coaster, Im pretty confident in saying that what we have seen in the last couple of days is all a part of the construction of the new coaster.
  21. This afternoon they've started to removed the gravestones from Boot Hill. (Photo: TPSN)

Account

Navigation

Search

Search

Configure browser push notifications

Chrome (Android)
  1. Tap the lock icon next to the address bar.
  2. Tap Permissions → Notifications.
  3. Adjust your preference.
Chrome (Desktop)
  1. Click the padlock icon in the address bar.
  2. Select Site settings.
  3. Find Notifications and adjust your preference.