Jump to content

Naazon

Members
  • Posts

    1,531
  • Joined

  • Last visited

  • Days Won

    24

Everything posted by Naazon

  1. Us Greater Brisbane people can re-attend from 6pm tonight though.
  2. I actually think with some negotiation with the Studio, there could be even more space if required. Even if just for the quieter elements like Sub station, maintenance shed or even the station (can be easily sound blocked), or possibly a 'tunnel' built into the ride.
  3. If people don't know London like me, the red star is Heathrow Airport, London in the center and The London Resort will be somewhere near the marker in Swanscombe. Heathrow is roughly 30km from London, and Swanscombe is another 30km from London. Google says from Heathrow its a 1 hour drive or 3 hours by public transport. From London its a 45min drive or 50min by public transport. Obviously times may vary with the exact location and possible future public transport infrastructure.
  4. My kid LOVED the FMX show. It was short enough to keep his attention, there was shade around, you're super close, and the host was entertaining. No real preshow apart from music but with 4 shows a day and enough space to view, we kinda just walked up when we wanted to watch and didn't need to wait it out.
  5. The ride is designed to fall so if it breaks from lack of maintenance it still operates as intended.
  6. Throwing ideal, but not likely random dates out cause I can, and assuming they follow the 2021 announcement and no delays (haha)... Q2 2021 Announcement Q3-4 2021 Deconstruction (scrap) Q1 2022 Build commence Q4 2022 Completion
  7. Also I remember reading somewhere they were planning a move away from superhero rides for a bit?
  8. No... the film will be good marketing for the ride. Films can spend as much as the ride cost on marketing. VRTP will be lucky to announce a ride let alone market it.
  9. Work being done on it now. Car has moved off the section. Testing cycles being run now
  10. I just got here and it looks like an estop. A car is stopped on a block break. Maybe not. Harness's are still locked.
  11. I'm there wednesday so if no update by then AND if I remember, I will
  12. Is that this one? https://www.reddit.com/r/rollercoasters/comments/kj3mys/big_apple_coaster_ny_ny_went_to_the_big_apple/
  13. Assuming @HussRainbow87will know or have a solid idea.. What does it take to change the cycle When its changed will VRTP need to run test cycles (ie, best to make new cycles during maintenance period) Are they able to have a number of presets and run each one depending on the parks attendance Whats the logic and computer systems like behind this? will it have problems later on not allowing such changes or is Huss pretty decent with keeping systems updated
  14. Not to mention usually pick up people shedding the virus, so someone whos long past the infectious stage.
  15. Do we have a height requirement for the vortex yet? Not sure if my little one will make it?
  16. Maybe it is, and the coaster is the "wild ride" you have in the room. Also accurate you leave 2 minutes later.
  17. SCHOOLS OUT RULES OUT DONT TELL ME WHAT TO DO
  18. Running smooth and pretty quick operations today. Only the 1 train but queue was quite short anyway.
  19. Not sure if this has been posted but the pot plant blocking the path is gone and 2 very very temporary fences are there.
  20. Sounds like I can justify attending as a learning experience now.
  21. I hoping it will be Saturday morning, but seriously unlikely.
×
×
  • Create New...

Important Information

By using this site, you agree to our Terms of Use. We have placed cookies on your device to help make this website better. You can adjust your cookie settings, otherwise we'll assume you're okay to continue.