Skip to content

Leaderboard

Popular Content

Showing content with the highest reputation on 03/10/18 in Posts

  1. Perfect new themed land for a future Dreamworld upgrade. "Construction Site Land". They literally already have most of the themeing in place!
  2. Its really simple. If you want to maximise capacity on SE you don't actually have to modify the ride at all. When Superman first opened it ran with about 8 operators! 1 Greeter 1 Grouper 4 Load Attendants 1 Unload Attendant 1 Panel Operator With this sort of Ops a Que back to. the start of the lockers took about 15mins to run through. Purchase a 3rd train for rebuilds so you always have 2 trains running every day and you will have crazy capacity. But mostly it's just about operations.
  3. @AlexB I didn't come down in the last shower. I've studied every inch of that crane and no connection could be found. If you want to talk about good ideas than I'm your man because all DW needed to do was fit a boom to the TOT. Talk about a solution looking them in the face all along.
  4. Does it ever go down for extended maintenance, if so, contact Dreamworld immidiately.
  5. Thanks heaps @themagicianI always love your updates. For @Gold Coast Amusement Force and those who are struggling to imagine what it looks like. I have drawn a picture to help you visualise the crane and what it is doing.
  6. Get excited people, we now have two cranes
  7. Perhaps Movie World can finally get that east coast high-speed rail built??
  8. Laugh react, donโ€™t need to reply
  9. Or alternatively, don't waste money on unnecessary alterations to a ride that already works well, and instead use it to build exciting new attractions!
  10. this is my custom no limits controller built by Lev's inventions on YouTube
  11. No wonder they canโ€™t get crowds with 3 major rides closed for most of the year. Sad to see a once great theme park being run so poorly
  12. Behold, the illusive reopening dates appear. All within about a week of each other?
  13. tower crane on top of giant drop now confirmed. In other news - look at that giant erection. eh... Movie World's one was bigger.
  14. Really? thats the path you go down? You completely failed to pick up the giant drop self erection?
  15. Yeah - they need a bouncer to card everyone at the door. No government issued photo ID, no ride.
  16. And would fit in with the LEGO Store too
  17. Nope, I'm older than 13 and don't want to put up with people that age and younger yelling into a mic.
  18. What if they build a multi-level underground tunnel with a train in each. They could easily accommodate at least 6 trains.
  19. Your crane would only function as a lift because you have a short boom.๐Ÿ˜Š
  20. @AlexB but today is an exception. No photos. But just imagine a large crane near the ride area doing crane things
  21. wow that looks terrible. looks like they need to give it a good scrub haha
  22. Smoke, vandalise, damage property, steal, fight and cause havoc. Youโ€™ve just got to have a positive mindset.
  23. Is this a statement, a question, or a thought? Either way, i'm glad the community is making good use of the fountain of improbability.
  24. Ain't it just hilarious when a newbie comes along and (despite being dissed for a variety of reasons) keeps coming up with all these great topics that everyone else just loves to keep talking about!๐Ÿ˜
  25. They'd be better off starting a new park. Sure, it's possible, but the park would have to be completely re-done in the state it's in, and with the incident last year profits are probably going to be higher with a new park. Becoming a Disney-like park, sure I'm all for DW doing that, but becoming an actual Disney park probably wouldn't work.
  26. Dreamworld has finally come into terms to remove cages from the ride
  27. Hydrocoaster and RIP have all been pushed back to november now. Fuck this theme park, honestly.
  28. Fingers crossed ๐Ÿคž They open early. Wishful thinking I think though.
  29. What if you duplicated the stations? You could place a rotating or sliding track section leading from each station into the subway tunnels, and the same after the trims at the end. I canโ€™t see you ever getting 4 trains running then, but you could definitely get 3.
This leaderboard is set to Brisbane/GMT+10:00

Account

Navigation

Search

Search

Configure browser push notifications

Chrome (Android)
  1. Tap the lock icon next to the address bar.
  2. Tap Permissions โ†’ Notifications.
  3. Adjust your preference.
Chrome (Desktop)
  1. Click the padlock icon in the address bar.
  2. Select Site settings.
  3. Find Notifications and adjust your preference.