Everything posted by New display name
-
Sky Voyager Discussion
I don't give a flying toot what DW management think of me. I'm DW's customer not the other way around and I'm defiantly not here to suck up to any theme park.๐
-
Sky Voyager Discussion
@JobeThe word "bullying" has lost all meaning here because people like โ@(&โ use it as it an attack on others when they are losing a debate. Everything I wrote was a joke and the people that laughed got it. I only used Push because his name was on the bin. If your name was on the bin guess what. The joke would have been about you. Itโs a joke. Some people here believe they can run a theme park from a chat room. I say lighten up and have some fun.
-
New and very different attractions
It doesn't matter if WH&S are keeping an eye on the park because all it proves is DW still can't get an attraction up to standard. The standards haven't changed on how a ride is built and I believe most of the changes that have changed with WH&S are regarding maintenance, inspections, operations and training of staff. I havenโt seen anywhere it now says you must now add cages to flume rides or add seat belts to Disk-O rides. It doesnโt take WH&S 4 months to sign off a ride because WH&S had no problems signing off Sky Flyer before Christmas.
-
Sky Voyager Discussion
You know what they say. Once you go black you never go back or was it, once you go Asian you never miss an equation. ^
-
New and very different attractions
?
- Dreamworld CEO talks thrill ride replacements off the back of Ardent Leisure cash injection
-
New and very different attractions
@CaptainLazerGunsSV isn't a one off attraction.
- Dreamworld CEO talks thrill ride replacements off the back of Ardent Leisure cash injection
-
Dreamworld CEO talks thrill ride replacements off the back of Ardent Leisure cash injection
@CaptainLazerGunsDW has stuffed everything they have set out to do in the last 3 years. In fact DW has spent 30 million dollars with nothing to show for it. What do we have? Dreamworld Express isn't going. Wipeout gone with no replacement. 2 new dirt piles within the park. A new ride that can't open because nobody will sign it off because it's built shit. Tiger Island stage 3 which is now left to overgrow in the corner. Jelly Belly store closed. Dreamworld Cinema closed. (facade destroyed) Eureka promised but removed. Brock's Garage closed. Log Ride trashed. Kevil Hill closed. Parkway closed. @Richardin the future can you please mention Play School Wheel was completed successfully to balance the article out.
-
Dreamworld CEO talks thrill ride replacements off the back of Ardent Leisure cash injection
"There's no question that the road ahead is still rocky for Dreamworld. A few thrill rides are just the tip of the iceberg as far as fixing Dreamworld goes, but it'd certainly be a step in the right direction after several years in limbo".
-
Dreamworld CEO talks thrill ride replacements off the back of Ardent Leisure cash injection
2 Years wait plus how long it took to build Rivals. The Smiler crashed at Alton Towers in 2015 and the first plans were submitted for Wicker Man in April 2016. Wicker Man opened in March 2018. DW have been kicking the can long enough and should either sell up all go all in.
-
Wipeout Removal
@pushbuttonI've been informed this area will also be receiving a Push plaque.
-
Sky Voyager Discussion
www.seek.com.au if you I want a job at a theme park. Park Health Facility is a stupid name for a First Aid Room.
-
Animal Activists now targeting farms!
- Sky Voyager Discussion
@pushbuttonIf you have a problem with the plaque you can contact DW at info@dreamworld.com.au- Sky Voyager Discussion
Picture this. @pushbuttonis riding the Play School Wheel and it's a little too fast for him and he gets dizzy. Push takes himself to the medical room for a little laydown. During Pushโs recovery he overhears the staff talking how DW are building a clone Bermuda Triangle. Push instantly goes into cardiac arrest and an ambulance is called. Time is wasted while the ambulance crew are trying to get push and their equipment out the door while performing CPR on Push and he doesnโt make it. โน๏ธ DW spent the money for a new First Aid room and managed to F it up. Don't believe me? DW have a plaque for @pushbutton at the entrance.- Sky Voyager Discussion
You're clutching at straws a little. Most double doors are locked on one side, top and bottom. It would be quicker to push a wheely out of the way. Critical emergency like TRRR the double doors would do nothing because they were killed instantly. BUT Considering the first aid room holds stretchers, I would think you would want to make it easier if you had to transport a person out of the door on a stretcher.- Dreamworld borrows money for new Thrill ride??????????????
If somebody can open this and paste it I will give you 1 like with a wink. ASX RELEASE5 April 2019ARDENT LEISURE FINALISES US$225 MILLION DEBT FACILITY Ardent Leisure Group Limited (ASX:ALG) (Ardent) today announced the completion of a US$200 million term loan facility, comprising a US$125 million drawn term loan and a US$75 million delayed draw term loan, as well as a US$25 million Revolving Credit Facility (collectively, the Facility) by its wholly-owned US subsidiary, Main Event Entertainment, Inc. (Main Event). The Facility will be secured and guaranteed by Main Event and is non-recourse to the other assets of Ardent.The proceeds of the drawn term loan were used to repay Ardentโs existing Australian bank debtfacility, and the balance of the proceeds will be available to support investment in Theme Parks and Main Event as well as general corporate purposes. Following completion of the refinancing and after repaying the existing bank debt facility, the Group will have in excess of AU$80 millioncash. In addition to these funds, Main Event will also have access to US$100 million in undrawn facilities. The Board of Ardent assessed a range of alternatives to fund the growth plans of its two businesses, with a view to achieving the optimal balance of quantum, strategic and operating flexibility, tenor and overall cost to shareholders. The Facility provides Ardent with committed, longer term funding that enables it to make the necessary investments to return the Theme Parks operations to profitability and to support the development of new Main Event centres.Over the past 12 months, the management team of Main Event has made significant progress, with recent new centre openings generating strong results and return on investment, and developed a healthy pipeline for future centres. The funds available to Main Event under the Facility will be utilised to accelerate the development of new Main Event centres, with a target of approximately 5 to 8 new centres per year. Let's hope DW also spend the money to get SV open quickly.- What's gone wrong with SkyVoyager?
I'll take 1 Vintage car please. First stop KFC drive thru.- What's gone wrong with SkyVoyager?
And people wonder why I wouldn't put my kid on a DW ride.- What's gone wrong with SkyVoyager?
I'm still not satisfied. Can I get a time of passing DW @themagician @Slick- What's gone wrong with SkyVoyager?
Went past 4 weeks ago and it was still sky voyager. ๐ @AlexB What did it say when you went past?- Movie World Maintenance 2019
Clark County spokesman Erik Pappa said he could not specify whether the woman was missing her legs or arms, but he confirmed on Thursday that she had lost her limbs before the fall. 737 Max took weeks after the second accident to shut it down completely. I wouldn't connect a link until you see other similar coasters going down.- What international park \ destination is better for someone with young kids?
Spending money on an overseas trip I wouldn't care much on what a 4 year would want to see or do. In a few years your son will be lucky to remember it. Do what I did over Christmas and leave the kid at home with the wife and go by yourself.- Someone is coming to Dreamworld
This brings me 2 thoughts After Monday & Tuesday even the calendar says WTF...... Queues at Dreamworld ๐ค WTF..... - Sky Voyager Discussion
Important Information
By using this site, you agree to our Terms of Use. We have placed cookies on your device to help make this website better. You can adjust your cookie settings, otherwise we'll assume you're okay to continue.