Everything posted by Rivals
-
Movieworld Update, 19th September
(thought this would be the appropriate topic) but as of right now; - Rivals - Green lantern - Justice League - Scooby (2nd time down today) are all closed, with Wild West being 100mins, Superman being 90mins, Batwings sitting at 50mins and Doomsday’s at 35mins. The park is definitely seeing the effects from the closed rides.
- Will Fright Nights be less popular due to the price increase?
- Movieworld Update, 19th September
-
Will Fright Nights be less popular due to the price increase?
I will say normally by this time a large majority of the nights are quoted as “selling fast” or have already sold out. This year it’s just the first two nights and the last night that are “selling fast.” Since my friends are GP, they have been disappointed regarding the prices and i know a lot of people that went and enjoyed it previous years are no longer going this year due to the price increases. I know that’s not everyone but i feel like a lot of people will be thinking “i did enjoy it but that’s a bit too high”, i’ve even seen social media comments saying they don’t want to spend that much when tagged by friends🤷♀️. So i guess we’ll find out, atleast the queues would be shorter for the people who are attending.
-
DC Rivals HyperCoaster train stuck mid-course
If they did reach out and receive advice from Mack, the advice would’ve been a well tested process for how to recover trains that valley, therefor giving it a lesser chance for failure meaning they probably would’ve tried again if that’s the only piece of advice they’ve received. It doesn’t take nearly 2 weeks to call a company and get advice, even if Mack had to send people over would it take that long? I feel like MovieWorld thought of the idea they tried going through with, now that it’s failed they are contacting Mack.
- DC Rivals HyperCoaster train stuck mid-course
-
2022 Golden ticket award winners
I’ve seen people who have been on both rank Rivals and MT, I don’t really think a mid sized wooden coaster go up against a hyper coaster widely regarded as ‘one of the worlds best.’
- DC Rivals HyperCoaster train stuck mid-course
- Movie world Maintenance 2022
-
2022 Golden ticket award winners
Golden Ticket awards are meant to be international but it’s mostly just american. I mean in 2017 Mystic Timbers beat out DC Rivals for best new coaster.
- DC Rivals HyperCoaster train stuck mid-course
-
Top Thrill Dragster at Cedar Point "Closing"
Premier and Intamin are two different manufactures. Premiers coasters (such as SRII’s) are capable of stopping from LSM’s alone, whereas Intamin’s don’t seem like they are able to do that as all of their LSM coasters have a serious of break fins following the launch.
-
Top Thrill Dragster at Cedar Point "Closing"
correct me if i’m wrong but, i'm 90% sure the break fins are needed due to the LSM’s alone not being able to slow the train down fast enough, so the break fins are used to mostly slow the train down while also putting less pressure onto the LSM’s in the chance of a roll back.
-
Top Thrill Dragster at Cedar Point "Closing"
Also, if the hydraulic launch system is making the ride be down more then 60% of the time, yeah it might be a good launch but would you rather have a powerful launch but a ride closed 60% of the time, or a slightly less powerful launch with the ride down probably 20-30% of the time?
-
Dad sues Dreamworld after son falls from stationary attraction
There has been a sign on the train itself since they brought it back, i personally wouldn’t see an object that’s clearly not designed to be a play structure and think “hey let’s let my kids play all over it” I mean the size and design of it, the slopped roofs, and the concrete floor underneath is a pretty clear give away its not a play area imo🤷♀️
-
Top Thrill Dragster at Cedar Point "Closing"
Intamin LSM’s aren’t bad at all and look quite intense, im eure the public would much rather a different launch feeling then it be completely demolished. Since the track would need to be replaced for the launch and potentially if they do add a camel back, i wonder if they’ll just replace all of the track to make it run for many more years.
-
Disney Cruise lines set sail in Australia
A friend and i were looking into going on the cruise but we figured out very quickly just how expensive the rooms are, we found; - cheapest room type 2 people = $2,204.68 total - most expensive room type x2 people = $5,165,98 total I think it’s pretty safe to say it is way too expensive. As for visiting disneyland, i’d much rather a Six Flags or Cedar Fair park as that targets my demographic a lot more and also isn’t nearly $1000 a ticket (or whatever it is).
-
DC Rivals HyperCoaster train stuck mid-course
According to the parks website, Batwing has reopened. School Holidays are starting in a week from today, if Rivals is still in the same spot nearly 2 weeks later im doubtful it will be open in time. Hopefully they can get it open for Fright Nights at least, even though there is other experiences and entertainment, having your signature ride closed (and superman most likely down) with already not many rides open during the event with a ticket costing $79-$99 isn’t a good look.
- DC Rivals HyperCoaster train stuck mid-course
- DC Rivals HyperCoaster train stuck mid-course
-
DC Rivals HyperCoaster train stuck mid-course
say the limit is exactly 50, and winds were 45 then that should be fine, but with how cold the track would’ve been (making the ride already run slow) with the trim break also on the first hill then add an empty train with less weight and a strong wind gust it makes sense why it rolled back. Im pretty sure Batwing was open when i left at around 4:15, so i’m assuming it myst’ve had issues closer to the park closing, which sucks as they can’t afford to have any more rides down currently (DC Rivals archway and beyond is completely closed now)
- DC Rivals HyperCoaster train stuck mid-course
- DC Rivals HyperCoaster train stuck mid-course
-
Gumbuya World 2 coasters under construction
Gumbuya Coasters Update: (credit: @mittythemeparks - instagram) The Track for the Skyloop has now been complete and is dominating over the parks skyline, with the supports for the SFC starting to go in. Now the Skyloop is done i won’t be surprised is all steam ahead on the SFC now, maybe a month or less and it’ll all be done?
- DC Rivals HyperCoaster train stuck mid-course