The park had a great atmosphere, it was really buzzing. Wait times varied quite a lot for each attraction, but in general the operations were fantastic. Jungle Rush in particular was a standout. It had an advertised 50min wait, though it only took me around 35mins to get on. They were getting the trains loaded up and dispatched extremely quickly. It was a similar story with Steel Taipan, the staff were doing a great job trying to get the trains out as fast as possible. I think the attraction with the slowest ops and longest wait time in the park was the Dreamworld Express. For some reason, it was taking almost 10mins to load/unload guests at both stations. It would definitely be good if the park could look at speeding that up a bit.