Everything posted by themagician
- Dreamworld Lego Store construction
-
Dreamworld Lego Store construction
When I've been to the park and checked out progress there is very little we can see inside, and the angles you can see from only show small parts of the shop. The other night when the lights were on was the most of inside the store I've seen. But I do imagine there would be a couple of Lego figures in there, but won't be installed until construction is completed so they can't be knocked or get damaged. Stock inside will be the last thing that will happen, and probably won't happen until about January 26. Looking forward to its opening. I do hope that everything will be completed, and we won't see work continue a couple of weeks after it opens like what unfortunately happened with Tiger Island.
-
Dreamworld Lego Store construction
Didn't manage to get any pictures, but did get to see inside the Lego store much more easily tonight as it was all lit up inside. In the centre of the store there is a large yellow, octagonal wall, which looks like it will be where the all different varieties of Lego will be found. There are are large yellow blocks hanging from the roof throughout the store. The stores lego logo also lights up. To the left of the store, there are large sliding glass doors which I imagine will be a part of the new exit from the park. And will link through to Main Street where there is that part fenced off.
-
Dreamworld reopening - the summer season
Went to the park tonight and the Fire Machine was pretty awesome. 10 minutes is a great length for the show and really keeps everyone captivated the whole time. The music does work well with the whole show, and don't think it would have the same effect if they had lyrical music playing. That screeching sound near the end was horrible though. The park was relatively busy tonight, carpark was about 60-70% full when I got there at 4. And waited at least 10 minutes for rides/slides. Weldint was being completed on HWSW, and testing of GD was also happening tonight. If anyone still hasn't seen the show, highly recommend you do this weekend.
-
Topgolf Gold Coast Construction
I think @reanimated35 map would work pretty well, especially if the building had a massive Top Golf sign facing the road just as you come off the highway. And it does make sense that if they've already got that gravel carpark there, why remove it and build a brand new one in another location, when they can build off this one and make it a proper bitumen one.
- Topgolf Gold Coast Construction
- Topgolf Gold Coast Construction
- Arkham Asylum stoppage/evacuation - January 2017
-
Dreamworld reopening - the summer season
HWSW was seen in testing throughout today
- Arkham Asylum stoppage/evacuation - January 2017
-
DC Rivals HyperCoaster construction discussion
@YLFATEEKS I would have taken some, but the media were stood on the corner where that fencing was, so didn't bother going down there.
-
DC Rivals HyperCoaster construction discussion
- Topgolf Gold Coast Construction
- Topgolf Gold Coast Construction
-
Tiger Island Refurbishment - Dreamworld 2016
Something I also want to add that I noticed, was that to the left of the stadium there are no signs saying where to leave prams, ramp access, etc. And I definitely think they need to add it. From the other side there are signs and people obey by what it says and leave their prams in a space that's out the way, but on the left side (looking out to the island) people leave them in the walkway and it made it difficult for everyone to leave (especially as the stadium was overflowing).
-
Tiger Island Refurbishment - Dreamworld 2016
I definitely agree with that @Slick, and don't blame them at all, as that is what I'd rather them do. Maybe we will see it ready for the Easter holiday period. Also to add, they were showing a number of the cameras on the big screen, particularly while the tigers were in the pool. It is really cool seeing this when the tigers are in the water and swimming down.
-
Tiger Island Refurbishment - Dreamworld 2016
-
Dreamworld Lego Store construction
- Dreamworld reopening - the summer season
Just been at the park. TOT is in testing Shockwave was being checked over and had some testing of seat harness GD had workmen on the top of the gondola, and men were varnishing the timber in the queue area Carpark about 60% full so far today And this sign has been updated:- Dreamworld reopening - the summer season
I'm fairly sure it goes for about 15 minutes- Wet 'n' Wild Buggy
- DC Rivals HyperCoaster construction discussion
From what I can tell when I've visited the park @Ryande16, it definitely seems like it is. Can I ask how you know that the track will begin arriving?- Dreamworld reopening - the summer season
This was posted a couple of days ago by William-Owen Jones who is a part of the Division 2 for the GC and just shows that the DW carpark is completely filling So great to see- Wet 'n' Wild Buggy
The pricing system is a bit confusing because they are displaying different pricing. But right now until January 24 (I think it is) you can only book in park, but after then you can book online. I suppose now they are going to try and take advantage of it while people are there. Also something to add when I was there was they send out 4 cars at a time, with about 30 seconds between each Buggy, and then a 5th one will follow which has a staff member in it, in case there are any issues while on course.- Wet 'n' Wild Buggy
- Dreamworld reopening - the summer season
Important Information
By using this site, you agree to our Terms of Use. We have placed cookies on your device to help make this website better. You can adjust your cookie settings, otherwise we'll assume you're okay to continue.