Work commences on the Dreamworld Water Park

Featured Replies

Nice update. Will the entrance be finsihed/opened before the xmas busy holiday period?

Will the entrance be finsihed/opened before the xmas busy holiday period?
I was wondering the same thing.

Edited by Adam

Well some people might have know, Either they know someone that works there, or there has been a thingo issued by DW. **** man. It was a simple question.

I haven't been down there recently to see at what extent this construction has done to the entrance building, but from what it looks like, it might just be a small building refitting and queue system re-design, which means definitely around the start of January, but if its something much more major, chances are this could pan out to be a small time consuming process. Richard, was there any interior demolition or is the main work going on the exterior of the buildings and removal of the old ticket booths?

  • 2 months later...

I went the other day and they've killed almost more than half the carpark for something. No idea at the moment.

Here is some more info about the waterpark:

Construction of Dreamworld Waterpark commenced after development approval was secured in December 2005. Watpac has been appointed as the construction manager with all major ride inventory ordered for installation mid 2006. The Waterpark provides an exciting opportunity to grow the Dreamworld business by introducing a range of innovative two and three day packages targeting the domestic family market. In line with the Group’s broader strategy, the Waterpark will focus almost exclusively on domestic business with only six per cent of revenues anticipated to come from international markets.

was at DW for a little while today, all i can say is....how small do they wanna make the water park. with the new carpark being built up to the temp fencing they have placed up. there is now the block of land were its going. It is fenced now from cylone end (were staff entry is) to just past the end of the cyclone(helix) this is not a very big space at all...ADD to this we need a front entrance to the park. I just cant see much being able to go in the space, especially if we see a wave pool wnw size, there deffinatley wont be much room at all.

it would want to become it, because even if it started the size t is now, it has nowhere else to expand

Yeah I think they'd definitely be using the old Thunderbolt area otherwise why would they bother with an area that small... where did you hear that T-bone? Is it possible there's another chunk of land that isn't fenced off yet? Seems unusual they would work with a small area.

Acutally I think Eureka would have to be their best full-curcuit coaster.

Edited by scott

Nah, Eureka is fun but cyclone is better... and with MW getting an accelerator I think DW will get a new one in the next few years!

Sure, Eureka is better, but Cyclone is considered to be more world class, even though it's not, at least at times if the line is right, can be enjoyable, Eureka ALWAYS has a long line. At Night Cyclone is great fun.

Me too but cyclone is worth the wait.... they need block brakes and 2 trains because loading takes ages though!

As much as cyclone is the best roller coaster in the park (other than TOT) It does NOT mean I like the ride, I dislike it, however if the line is like a 10 min wait I will ride it, or if I am with freinds, but otherwise it is NOT worth the wait.

They are def doing something on the old Thunderbolt site, when we were walking off the Cyclone we went down the emergency exit (stuff walking right around when you have a short cut haha) and there was some constructionworkers there..although they were just standing around staring at us walking down the stairs so my friend and I said "how's it going mate? having fun standing round doing nothing?" and they were like "having fun going on all the nice rides?" which we of course said absolutely..but still..def something going on in there. The car park is coming along ok, gonna be huge by the time it's finished though which is a good thing. On the topic of the cyclone line up, we walked right up to level 1 when we went on it, waited about 10 mins maybe 15 (guy was sooo slow though) and my friends were just getting inside as the guy was letting people in so they didn't even have to wait and this was at about 1-ish.

Edited by lisalila

Join the conversation

You can post now and register later. If you have an account, sign in now to post with your account.
Note: Your post will require moderator approval before it will be visible.

Guest
Reply to this topic...

Recently Browsing 0

  • No registered users viewing this page.

Important Information

By using this site, you agree to our Terms of Use. We have placed cookies on your device to help make this website better. You can adjust your cookie settings, otherwise we'll assume you're okay to continue.

Configure browser push notifications

Chrome (Android)
  1. Tap the lock icon next to the address bar.
  2. Tap Permissions → Notifications.
  3. Adjust your preference.
Chrome (Desktop)
  1. Click the padlock icon in the address bar.
  2. Select Site settings.
  3. Find Notifications and adjust your preference.