Jump to content

DC Rivals HyperCoaster construction discussion


Richard
 Share

Recommended Posts

I'm no expert but with them working on the braking area I'd say these supports are for the return to station not the bottom of first drop.   Maybe they will complete the circuit from where the current track is to the brake run before starting on the higher sections which will need larger cranes.   

Link to comment
Share on other sites

Couple more pictures of the pieces installed today, as well as some of the other components, and you can begin to how this will flow through from the S Bend.

IMG_7769.thumb.jpg.5e73456a3660b492cd7d53897c0778f6.jpg

IMG_7789.jpg

IMG_7788.jpg

It will turn sharply from here, getting close to the ground

IMG_7771.thumb.jpg.e2d614c84e5be464ae64bf93a91b78d0.jpg

IMG_7801.thumb.jpg.99fa74c62e77af763029be91e7321c96.jpg

Continue underneath the taller footings

IMG_7772.thumb.jpg.51e06d7d43bc519b50a544b332e7986d.jpg

And then I believe heading towards this point 

IMG_7773.thumb.jpg.544e7968f747dbad7df815f57db61571.jpg

Couple more angles of the new section today:

IMG_7775.thumb.jpg.73137f40ad6f0507b92b3c2a90a28ae0.jpg

IMG_7777.thumb.jpg.77ffdd326f06e854d22dc46a98d36f76.jpg

IMG_7778.thumb.jpg.d532cb403b894c3bfb563d9ead23c72e.jpg

IMG_7793.thumb.jpg.8364033f12faf82f89cc92c1cbcab1fc.jpg

Some of the pieces waiting to be installed:

IMG_7792.thumb.jpg.8551abb51f989fb071441b53f7330fc2.jpgIMG_7797.thumb.jpg.55c81d746aab5f211098df6676d23ef3.jpg

And you'll see that this is piece 81, to give an idea of how much will happen before and after this point

IMG_7774.thumb.jpg.7c737dfbd4108183e5333ad08acdfc80.jpg

This taller support was installed today also

IMG_7768.thumb.jpg.24cce1fd3568bf02ee997e6bc008fe90.jpg

First break run pieces have been installed also:

IMG_7810.thumb.jpg.96768e2ae80412d965fd98ce5186cdad.jpg

Overview from near GL

IMG_7808.thumb.jpg.91e5b5984c43bfc380299179d8c280b5.jpg

Part of the fencing has been damaged also:

IMG_7790.thumb.jpg.564a7520c861c036865f60b0a66ba711.jpg

And finally, I just love how tight the turns are on these pieces of tracks. Can't wait to see them installed

IMG_7804.thumb.jpg.bb95e067544ca19c91230e86ec1c9b51.jpg

IMG_7812.thumb.jpg.c184870b58caa876a100af026b5f2fb8.jpg

Edited by themagician
Link to comment
Share on other sites

18 minutes ago, themagician said:

IMG_7801.thumb.jpg.99fa74c62e77af763029be91e7321c96.jpg

Continue underneath the taller footings

IMG_7772.thumb.jpg.51e06d7d43bc519b50a544b332e7986d.jpg

And then I believe heading towards this point 

IMG_7773.thumb.jpg.544e7968f747dbad7df815f57db61571.jpg

Amazing pictures! Thanks so much :D

Now the speculation begins on the next element. I'm hoping for either an airtime hill, or as it looks from the pieces in the car park, maybe this will be the location of the Zero G Roll (assuming those pieces are for a Zero G Roll). 

Link to comment
Share on other sites

Hmmm so after looking back at similar elements to Flash at Lewa Adventure i think MWs coaster is going to be more intense. If you look closely at the twisty section of Flash you can see that none of the track pieces that make up this element have a reinforced spine as opposed to the twisty section of MWs coaster.

1 hour ago, themagician said:

 

IMG_7788.jpg

Screenshot_2017-05-05-18-30-05.thumb.png.f2bba35d833e1549f0f713f0bb5cb311.png

You can also say the same with the cork screw element

590c3773899a0_2017-05-0518_24_17.thumb.png.574d94977a3381447651ec0950d4eae4.png

590c39faa5387_2017-05-0518_37_21.thumb.png.11e93b59cb3d59776d6e0602c0f07c61.png

590c3a0d08619_2017-05-0518_36_57.thumb.png.5b81a2294e8dc66f8d312aef5765694b.png

 

 

 

 

Edited by Ryande16
Link to comment
Share on other sites

  • Richard changed the title to DC Rivals HyperCoaster construction discussion
  • joz locked this topic
Guest
This topic is now closed to further replies.
 Share

  • Recently Browsing   0 members

    • No registered users viewing this page.
×
×
  • Create New...

Important Information

By using this site, you agree to our Terms of Use. We have placed cookies on your device to help make this website better. You can adjust your cookie settings, otherwise we'll assume you're okay to continue.