Steel Taipan Construction - Dreamworld Mack launched roller coaster

Blue Fire Feature 154 members have voted

  1. 1. What would you prefer?

Please sign in or register to vote in this poll.

Featured Replies

  • Replies 2.3k
  • Views 498.3k
  • Created
  • Last Reply

Top Posters In This Topic

Most Popular Posts

  • themagician
    themagician

    This morning I was invited out to Dreamworld to get a sneak peek of Steel Taipan and a walk through of the entire area. I’ll start out by saying, overall they’ve done a good job with the area. It’s ve

  • Retardent
    Retardent

    Occasionally I'll search through tender websites for theme park projects and yesterday's search at work had delivered some treasure. Here is what is worth noting: This is what the queu

  • And we have supports. 

Posted Images

32 minutes ago, Hummel Bruhmell said:

the mcbr is not removable and it can and most likely will have 3 trains not 2 heck it might even have 4 trains

If you don't have to run 3 trains, a MCBR isn't needed ;)

2 hours ago, Hummel Bruhmell said:

the mcbr is not removable and it can and most likely will have 3 trains not 2 heck it might even have 4 trains

the 'mid course brake run' doesn't have to be removed, if it's never installed in the first place....

Heck, if you check the blue fire model group in RCDB (https://rcdb.com/r.htm?ot=2&mo=12376)

You'll see that most of the models shown only have 2 trains. Only the megacoaster has more than 3.

I think the fact that no park in Australia has ever bought more than 2 trains and the park that isn’t broke down the road still only bought 2 for rivals indicates that it will only have 2 trains. 
 

I expect they’ll run 2 trains for the first two weeks it’s open and then about 5 days a year after that. 

1 hour ago, djrappa said:

I expect they’ll run 2 trains for the first two weeks it’s open and then about 5 days a year after that. 

Considering it was reported on here that MDMC ran 2 trains for most if not all of the summer holidays I doubt this. Superman went the whole of Summer with only 1 train, likewise with Jet Rescue.

4 minutes ago, Tim Dasco said:

Superman went the whole of Summer with only 1 train, likewise with Jet Rescue.

That's a really strange ending to the post. It comes across as you saw the comment that it'll probably run 1 train as a DW V Village thing?

5 minutes ago, joz said:

That's a really strange ending to the post. It comes across as you saw the comment that it'll probably run 1 train as a DW V Village thing?

I realised I miss read the statement upon further reading.
 
But I do hope we see now with Greg being at Dreamworld it running 2 trains in at least the summer holidays being what will be the parks most popular ride (along with SV)

I'm not so sure @Gazza. I reckon it might. The longer that park stays closed the better its chances. Mean minimal disruption to day to day operation means they can freely move around the worksite. I would assume this indeed meaning taking some time off the total build time.

35 minutes ago, StingRay said:

Mean minimal disruption to day to day operation means they can freely move around the worksite.

Site access isn't blocked during opening hours - all of the old goldrush, studios, blue lagoon and any other access point is freely accessible when the park is open, provided the train is either closed or incorporated into the construction crossovers. Crossing pieces over the driveway only needs a lollipop man for the time it takes the crane to cross over.

What we need to look at is the fact that the pieces continue to arrive, and be unloaded, but seemingly without any groundworks taking place. I've not seen anyone post photos of groundwork machinery, footerings or collars being moved about... and if they're not doing that... then the assumed 'storage until later' plan appears to be correct...

TLDR: whether the park is open or closed, construction wouldn't really be impacted.

 

Edited by AlexB

True. We have not seen any construction equipment arrive. But if it did arrive they could have done of an evening by change. As you stated @AlexB that whole area is essential closed. So no major disruptions would occur. Maybe with all this track arriving, we might see earth moving equipment and the likes turn up by the weekend.

Guest
This topic is now closed to further replies.

Recently Browsing 0

  • No registered users viewing this page.

Important Information

By using this site, you agree to our Terms of Use. We have placed cookies on your device to help make this website better. You can adjust your cookie settings, otherwise we'll assume you're okay to continue.

Configure browser push notifications

Chrome (Android)
  1. Tap the lock icon next to the address bar.
  2. Tap Permissions → Notifications.
  3. Adjust your preference.
Chrome (Desktop)
  1. Click the padlock icon in the address bar.
  2. Select Site settings.
  3. Find Notifications and adjust your preference.