Updates for Saturday the 8th and Sunday the 9th - the end of QLD School Holidays.

Note: next weeks update will be on Sunday as well.

Comparison Shot 1

MW_Hyper-8July.thumb.png.3e77390880eaa2f45b09f61254bb948f.png

8th July - Roadside Shot

MW_Hyper-9July.thumb.png.152dc37d0795159f310db7447da149f3.png

9th July - Not quite Roadside Shot

Comparison Shot 2

MW_Hyper-Clustertrack9.thumb.png.3a7ea9001ab95f4eb1fef4696d411a20.png

First Hill/Bunny Hills

DSCN8074.thumb.JPG.850f1dd44278ebc97173e121b6b3585f.JPGDSCN8075.thumb.JPG.ff0aea65769f8ca6382b2fc8dbb8759a.JPG

Station Area

DSCN8082.thumb.JPG.f2ff27989426432ba68c5e65d3dcf7ee.JPG

DSCN8088.thumb.JPG.714c7c04a9a25f07b824f901a1a41fab.JPG

Station Platform and the roof are being constructed. Roof is the steel framing visible in the left of the photo.

Track and Storage Lot

DSCN8090.thumb.JPG.2ec9189c1926dcd7477641b4dbb6a380.JPG

Three track pieces on the road next to the first drop

DSCN8094.thumb.JPG.a2049058058ec1d80b3a8dc2dad8a827.JPG

I'm guessing the pieces above are either for the station or the LED Joker face.

Mystery Inc.

The saga finally comes to an end. The support returns.DSCN8112.thumb.JPG.62c03e6e652e76561bd81e0a3e767ac7.JPGDSCN8110.thumb.JPG.32c3d2b580c660679112be64d3e23d85.JPG

Fence Lighting

Wiring is clearly visible on almost every post now. I'd say the fence toppers aren't too far away.

DSCN8115.thumb.JPG.130aee99e078de0dad9e833b8cb18871.JPG

DSCN8076.JPG

Link to comment
Share on other sites

On 08/07/2017 at 5:25 PM, themagician said:

 

IMG_0010.thumb.JPG.9adb78838502c882605c18d4abeaf99b.JPG

 

IMG_0020.thumb.JPG.46427b1f46edd8939677af96d96bda9c.JPG

 

First picture - Cable? Are we looking at a cable lift rather than a chain lift? I wouldn't imagine they'd ship control (data) cable like that, so all I can think of is that its a launch\lift cable?

Second picture - I'm sure this will be station or similar, but does anyone have specific detail on how\where these pieces go\work?

Link to comment
Share on other sites

1 hour ago, AlexB said:

Second picture - I'm sure this will be station or similar, but does anyone have specific detail on how\where these pieces go\work?

I'm guessing they connect the catwalk to the lift hill track - there's quite a few of them and the brackets are angled at ~45°. Looks about the right width too.

Link to comment
Share on other sites

^as in control \ comms cabling? Of course - but I wouldn't have thought it would ship in a crate like that. Surely boards etc would come prewired, and then it would require them to be connected, which locals could do running cable off reels?

I wouldn't imagine they'd have pre-cut and wired every cable run they need and then shipped it in a crate like that - what if it's too short?

I mean - sure, i don't build these things so what do i know, but running lines from say a sensor, or controller would be spec'd for gauge\size etc, but surely they'd let a local run it, rather than ship pre-made looms?

Link to comment
Share on other sites

20 hours ago, themagician said:

@ThemeTendo

Just so you know, that wiring for the fence toppers has been there for months now. Been there before the track begun to be installed.

Ahh okay, thanks. Have to admit I don't usually pay attention to them but did notice that they're more organised/visible since the last time I did. :) 

17 hours ago, pin142 said:

You will find that is the ramp to the station platform and not the roof for the station in that photo.

Didn't even consider that. Thanks for the correction.

Link to comment
Share on other sites

So if a lot of this stuff is made locally (footers are a given) like cables and wiring and what not, what exactly do you get from the manufacturer when you order a coaster?

> Track

> Train 

> Bolts/nuts

> Control systems/PLCs

But what else? Or to phrase it another way, how much do you need to rely on 3rd party companies to build a coaster, not including theming?

Edited by Reanimated35
Missed the obvious train, thanks Tim
Link to comment
Share on other sites

On 6/28/2017 at 5:55 PM, MaxxTheMonster said:

MS Paint to the rescue...  Draw a line from the top of the top part to the bottom of the bottom part...  Looks like they will to me...

temp.png

 

On 6/28/2017 at 5:31 PM, gumb00t said:

This support has been hangin like this for a while now... Anyone else see that the top one looks like it won't line up with the ground support? Would this require new parts to be fabricated or concrete piles moved?

 

 

I knew it lol. No matter what angle it didn't look like it'd join up properly.

Link to comment
Share on other sites

  • joz locked this topic
Guest
This topic is now closed to further replies.
 Share

  • Recently Browsing   0 members

    • No registered users viewing this page.
×
×
  • Create New...

Important Information

By using this site, you agree to our Terms of Use. We have placed cookies on your device to help make this website better. You can adjust your cookie settings, otherwise we'll assume you're okay to continue.