The New Atlantis - Construction Updates

Featured Replies

Looks like they used the pile driver to build a dyke, or at the least, retaining walls. Can see the panels driven into the ground and a few unused ones laying on their side in the first photo. 

  • Replies 1.8k
  • Views 430.1k
  • Created
  • Last Reply

Top Posters In This Topic

Most Popular Posts

Posted Images

  • Popular Post

Coming late to the party but I'm really excited about Leviathan. The Gravity Group delivers very decent woodies with lots of airtime (quantity-wise at least) and great pacing. Great to see Australian parks picking up the pace, and it seems Sea World will have a good 1-2 combo with Jet Rescue :)

  • 2 weeks later...
  • Author

Plenty of work happening across the entire area of the precinct

Vortex construction. Still working on ground works with plenty of pipe work visible. I don’t think we will see this open until after the school holidays

73547F50-2530-4045-A41C-1771F66B093B.thumb.jpeg.4d8f9d6946ba964af6e895bdaf64d3ec.jpeg

7B273BE3-2275-43DC-B08F-4A3E4C314D56.thumb.jpeg.bc37968a6a3c08760a84cf64a9a8dc7f.jpeg

E18192CA-3C67-46ED-BD36-2A8E82539D11.thumb.jpeg.4534fbd672598af8da6b663593fb4a19.jpeg

70A05DD0-65D6-4F5A-B71E-E068D916C592.thumb.jpeg.ecacf0172bf23ab34646ed95e418d747.jpeg

D5A1B1AE-27EF-493B-8F9B-83AC15EE245B.thumb.jpeg.1d5e82682f5bb7d093721465d94cfabf.jpeg

E0CE8C67-DBFB-4AD4-83EF-24BDF191CCE7.thumb.jpeg.97627335647c00bdfdf6ed58a69729f4.jpeg


Leviathan Construction. In some of these photos you can see a timber structure being built which I believe will be the station (someone correct if otherwise). The grass from the Sea Viper site has been removed and replaced by gravel. The seating area next to Jet Rescue has also been removed and instead an extension queue for the ride has been installed. I wonder if this means they are going to adjust the rides entrance since so many just walk straight past it 
B63FEABC-C378-45C3-904D-2A6161CF938E.thumb.jpeg.3c0c5b5e90310e4178a32c0ceb1f307d.jpeg

51EF05B0-878E-4B05-8CEB-9CD56D66B628.thumb.jpeg.b3befcc28677f77230d8a7df6e7d589b.jpeg

826A57B8-67BB-403D-81FC-2F9302EDBC03.thumb.jpeg.7de7ae85625853a49cd5ac68234e3f0f.jpeg
417F14D1-FF05-4457-8869-D991D40AD306.thumb.jpeg.0bb85fb5828b1ea4be5e0caa84235348.jpeg

C3BAECAB-371C-46CE-BBEE-BC35280FD44F.thumb.jpeg.582b8f12412afbee10ca2a4d7d279286.jpeg

3433AD55-AB06-4131-9AFE-ADC57804E28E.thumb.jpeg.e84af42ea3e97c274055043a90b1a0d9.jpeg
C6BC54F6-2450-488B-8E30-E43830618407.thumb.jpeg.6d4fec47b848c8caaef17125f6e18805.jpeg

  • Author

@Gazza Good. Nothing major to note, just a look of ground prep right now. Unfortunately the monorail is closed so we can’t get a view from that angle (and I imagine it will be until the coaster is completed)

Edited by themagician

  • 3 weeks later...
  • Author

Nearmap update from Dec 2

FCA09B58-7FE6-4FF2-BE01-74A3775533DB.thumb.jpeg.a07939f8e46dbd880b9f273ed13fb4a8.jpeg

Plenty of ground works happening

C23D1A08-4FE8-4470-A469-A0E957582C7E.thumb.jpeg.e266a1d6d546d4c7c7c8399cafe95037.jpeg

And you can see the work that’s been happening on the SV site and the grey roof near the monorail track is the structure I took photos of the other week 

Hopefully they might add some aircon to the monorail while it’s down, 

Apparently construction is 8 weeks behind  so that would mean end of January early February for Vortex opening? 
lots of ground movement now Also, so I guess you can say leviathan construction has officially started 

1 hour ago, colonelbmx said:

Hopefully they might add some aircon to the monorail while it’s down, 

Apparently construction is 8 weeks behind  so that would mean end of January early February for Vortex opening? 
lots of ground movement now Also, so I guess you can say leviathan construction has officially started 

I feel like it would be a bit unlike Village to open it on a non-holiday time-frame. They might want to hold off the extra month until the easter holidays come around?

10 hours ago, themagician said:

Air conditioning won’t and can’t be added as the monorails don’t have enough clearance in some stations and in their maintenance bay 

There are alternatives to roof mounted AC units though.

Although I doubt the power supply on the track would handle the additional load.

5 hours ago, AlexB said:

There are alternatives to roof mounted AC units though.

Although I doubt the power supply on the track would handle the additional load.

Would be great to add some aircon as it is a nice scenic ride and with little kids it is a fair walk from end to end but its like a sauna most days, maybe a new station in Atlantis wouldn't go astray either but I think thats probably pushing it 

9 hours ago, colonelbmx said:

Would be great to add some aircon as it is a nice scenic ride and with little kids it is a fair walk from end to end but its like a sauna most days, maybe a new station in Atlantis wouldn't go astray either but I think thats probably pushing it 

Cut off the roof, problem solved

Guest
This topic is now closed to further replies.

Recently Browsing 0

  • No registered users viewing this page.

Important Information

By using this site, you agree to our Terms of Use. We have placed cookies on your device to help make this website better. You can adjust your cookie settings, otherwise we'll assume you're okay to continue.

Configure browser push notifications

Chrome (Android)
  1. Tap the lock icon next to the address bar.
  2. Tap Permissions → Notifications.
  3. Adjust your preference.
Chrome (Desktop)
  1. Click the padlock icon in the address bar.
  2. Select Site settings.
  3. Find Notifications and adjust your preference.