Jump to content

The New Atlantis - Construction Updates

Featured Replies

  • Replies 1.8k
  • Views 430.3k
  • Created
  • Last Reply

Top Posters In This Topic

Most Popular Posts

Posted Images

16 minutes ago, AlexB said:

You mean they're putting in TWO new attractions? 

Yes TWO new attractions and maintenance times are already set.  (for the dumb, this is a joke)

Mellow Yellow Bumper Boats   -   26 Dec 2020 - 27 Jan 2021

Vortex Spewathon The Ride     -   All f&*ken winter

 

Edited by Skeeta

15 hours ago, colonelbmx said:

Hard to see in the pics regarding the fountains/water scenery but there is definitely some sort pool pond fountain setup been installed. I’ll try for some closer pics

You know, it looks like a fountain, but ultimately when its finished, it's just going to be a garden bed.

  • Author

Some comments I’ll add. The smaller green building is the control booth. I can’t tell if it’s been painted green or covered in foam to be moulded, etc.

The bigger building, is that to do with the mechanic of the ride or could it be for the queue area? From what I could see (which wasn’t a lot), there didn’t seem to be anything in there. If in fact it is the queue building and it creates a pre-show in some way, that should be awesome.

It does also appear there will be fountains under/around the ride too. 
 

I do also hope they create a great entrance for the whole precinct. And not just have a sign like they did for COTD. It needs to set the atmosphere and style for the theme/story of the precinct 

Well if the park map is anything to go by, that fountain that was promised in the renderings will look more like a round about..

image.thumb.png.4adb9e75cabbe87a61bbf86af1e4c502.png

  • Author

In that case, those dolphins are now whales. I definitely don’t think the map is anything to go by as it’s been very roughly put together in photoshop/illustrator someone who had little time or hasn’t used the program before 

Hey, just going by whats there, and what is there matches the Styrofoam pieces from sculpt studios...

On 07/03/2020 at 5:55 PM, themagician said:

The first part of the counter weights have been installed (Photo TPSN)

 

6D1C635D-43C0-4854-93F1-B814DB516D63.jpeg

Thats complete, they have two plates on the inside, and one on the outside.

 

soo exciting!

For the love of god pick an artwork and stick with it

Guest
This topic is now closed to further replies.

Recently Browsing 0

  • No registered users viewing this page.

Important Information

By using this site, you agree to our Terms of Use. We have placed cookies on your device to help make this website better. You can adjust your cookie settings, otherwise we'll assume you're okay to continue.

Configure browser push notifications

Chrome (Android)
  1. Tap the lock icon next to the address bar.
  2. Tap Permissions → Notifications.
  3. Adjust your preference.
Chrome (Desktop)
  1. Click the padlock icon in the address bar.
  2. Select Site settings.
  3. Find Notifications and adjust your preference.