Jump to content

New display name

Members
  • Posts

    7,603
  • Joined

  • Days Won

    219

Everything posted by New display name

  1. https://www.trybooking.com/events/landing/1216835 Get ready for an electrifying celebration like no other! Join us at Dreamworld Gold Coast as we illuminate the night sky with the brilliance of The Grand Diwali! Theme park rides till midnight Fire Show Laser Light show Food trucks Non stop Dj Non stop performances Live Singing Live Drums performance never seen before Lots Giveaways Face painting Special Cultural stall Don't miss this opportunity to celebrate Diwali with your family..
  2. I believe each manufacture has it's own commissioning program. I know what Mack do because I have a copy of their commissioning process, but I don't know Vekoma. The Leviathan's manufacture engineer, was in the control both after the ride opened watching, every cycle.
  3. Now you are getting it. Can we get back to the part where you said DW commissions the ride and not Vekoma. I need some clarification on what you said.
  4. Without being able to question Greg, it's not really evidence.
  5. Sounds like a standard response from a theme park, to me.
  6. @ShakeShack I think you might be reading to much into it.
  7. This is what you said: This is what Greg said: What you said and Greg said, are worlds apart.
  8. Everybody on the planet is happy JR is testing but being behind in construction, isn't smart management @Levi It's poor planning. What are the chances of a soft opening to iron out any kinks with the new rides?
  9. Leviathn's testing was completed at night because SW was behind schedule, and we all remember how that opening turned out.
  10. Test at night shows DW are behind schedule. Let's hope they can get it open.
  11. Oh shit, I didn't click post. Thank you for telling me, so I can fix.
  12. I would only be happy with a re-theme of MC if the re-theme included, ditching the motorbike trains.
  13. I got a $99 offer from DW but I already have a pass. While my partner received a $89 offer from DW.
  14. Who told you is was closed to accommodate MM and JR construction? I thought it was closed for the shop to be re-themed.
  15. My sources are telling me, the Bort licence plates are stuck on a ship and the new shop won't open until the problem is resolved.
  16. The only photo that I know circulating is this one. Parkz overview on what happened at the time of removal. "The ride was standing but not operating (SNBO) from August 2003 until early 2004, during which time it was offered for sale through various second-hand ride sales agencies. The Thunderbolt was removed in March of 2004. The removal was done in such a way that it is clear the ride was scrapped and not sold. The park however does still have the trains and some sections of track, presumably for construction of a memorial of sorts to the Gold Coast icon."
  17. I agree with you Spotty. Good businesses are always reviewing how they work and what can be improved.
  18. You can't start blaming the weather now because rainfall hasn't been above average this year. If anything, DW, had a really good run of good weather.
×
×
  • Create New...

Important Information

By using this site, you agree to our Terms of Use. We have placed cookies on your device to help make this website better. You can adjust your cookie settings, otherwise we'll assume you're okay to continue.