1 hour ago, New display name said:

I can't remember MW ever doing a stage fit-out, can you?  DW did it with the kids zone but I don't recall MW doing one.

No neither, but if they want to minimise downtime of the ride that's already had extra downtime this year because of Flash construction, maintenance and hydraulic launch issues, amybe they should. The parks reputation is currently 'everything is closed' and 'it will probably break down'. So if they want to start to repair their image, they should stage or minimisise the amount of time the ride is closed again.

Link to comment
Share on other sites

3 hours ago, STRAWS said:

Wild West Falls matainence has been extended 😒.

 

image.thumb.png.7da02da794a297710b473b353c827b79.png

Down for the entire QLD school holiday period too, at least its winter so it probably wouldn't have been that popular even if it was open

Link to comment
Share on other sites

On 20/06/2024 at 9:13 AM, New display name said:

I can't remember MW ever doing a stage fit-out, can you?  DW did it with the kids zone but I don't recall MW doing one.

I can't remember Sea World ever doing a wooden coaster before covid, can you?

On 20/06/2024 at 11:53 AM, New display name said:

What a dumb question when you already know the answer. /s

*cough* PICO *cough*

Link to comment
Share on other sites

1 minute ago, Dean Barnett said:

Why can’t they just paint it after hours? 

They likely contract the work out and don't want to pay more to have them there at night, plus on cold nights it may not dry in time for testing in the morning

  • Like 1
Link to comment
Share on other sites

26 minutes ago, Dean Barnett said:

Why can’t they just paint it after hours? 

Yes, have several workers pull consistent all-nighters so they can bring cranes into the ride envelope, paint a couple track pieces if they’re lucky, then remove ‘em all by the time testing begins in the morning, at which point none of the paint will have dried & the only thing that’s pink’ll be the train. That sounds both ethical, logical, and financially viable.

Edited by Tricoart
  • Like 1
Link to comment
Share on other sites

2 hours ago, Dean Barnett said:

heard of roadworks?

Such a stupid comment I mean really Dean even you know better.

49 minutes ago, Brad2912 said:

yeah, they are completely unrelated to theme park roller coasters.

The fact hes tried to comprare this .

Edited by STRAWS
Link to comment
Share on other sites

12 hours ago, Dean Barnett said:

Why can’t they just paint it after hours? 

Because the cost to do these works at night would be so much higher it would probably cost more than what it would to repaint the whole track. Plus all the other reasons people have given.

No need to rush the repaint when they can just do it during next years maintenance. I’d rather have the ride open for the rest of the year than close for a month or two (again) just for a repaint.

But also another reason would be because reopening it hours after it has just been painted would cause a lot of issues for the rides operation and we’d end up with a situation where it valleys again (and we know how long it took them to reopen it after that happened). After Superman Escape was repainted several years ago, the ride reopened a week after the painting was finished and it had several rollbacks because the paint needed to wear down. If I remember correctly, the ride was closed for even longer because they had to do extensive testing to ensure it wouldn’t happen again.

Link to comment
Share on other sites

12 hours ago, Dean Barnett said:

Why can’t they just paint it after hours? 

I'm presuming you want them to paint it at night so they can run the ride during the day?

They use a specialised Jotun coating, the stuff is great, but can be easily dinged up if touched while still curing. The consistency is kind of like a starburst chewy lolly when drying.

https://www.parkz.com.au/photo/14398-Movie_World_hypercoaster_construction/gallery/sort/oldest/location/dc-rivals-hypercoaster/offset/135

There's no feasible way you could do paint and then have trains running on it the next morning.

 

  • Like 1
Link to comment
Share on other sites

Join the conversation

You can post now and register later. If you have an account, sign in now to post with your account.

Guest
Reply to this topic...

×   Pasted as rich text.   Paste as plain text instead

  Only 75 emoji are allowed.

×   Your link has been automatically embedded.   Display as a link instead

×   Your previous content has been restored.   Clear editor

×   You cannot paste images directly. Upload or insert images from URL.

Loading...
  • Recently Browsing   0 members

    • No registered users viewing this page.

×
×
  • Create New...

Important Information

By using this site, you agree to our Terms of Use. We have placed cookies on your device to help make this website better. You can adjust your cookie settings, otherwise we'll assume you're okay to continue.