  On 12/04/2025 at 12:53 AM, Dean Barnett said:

Lets say it’s just under $2m per train

Expand  

Let's not.

  On 12/04/2025 at 12:53 AM, Dean Barnett said:

$20 a backwards seat on 3 minute cycles - they’d pay the extra train  off in a year. (Assuming they filled every seat)

Expand  

A very poor assumption at best

  On 12/04/2025 at 12:53 AM, Dean Barnett said:

2 minute cycles with 50% of the backwards seats been filled would pay it off in 20 weeks! 

Expand  

It is clear by the math \ logic you're using that you have zero clue how to run a theme park.

 

  On 12/04/2025 at 1:49 AM, wikiverse said:

the rotating bins don't seem to be functional

Expand  

It was a great concept for the ride but like everything else - another set of moving parts for something to go wrong. If it doesn't get it right every time, it's better to turn it off.

 

Link to comment
Share on other sites

Thoughts on MW installing dispatch screens similar to Toutatis or Rapterra to 'help' with dispatches?


image.thumb.png.35817ac2e9e700eabcc02ffd33814684.png  image.thumb.png.5303dda09b6fe3a69d9b0c8fd1a76ba0.png 

A part of me thinks it would help if they have realistic fast dispatches as the benchmark however, knowing VRTP they'd pour lots of money into it, fail to maintain the screens and before you know it they're all off and not working.

Link to comment
Share on other sites

  On 14/04/2025 at 12:29 AM, New display name said:

Instead of having one train waiting for the train in the station to be loaded, you now have 2 trains waiting.  Sounds like a great idea @Dean Barnett

Expand  

Is that last straight part before the station flat, make it an unload station it will help speed up the load, then because we are now spending money money money… like new ride level of money then let’s add another block on the transfer turn to hold the trains for if they have been unloaded before they are ready for dispatch… no trains waiting except for empty ones

Link to comment
Share on other sites

Let's just be clear here - modifying rivals is never going to happen. The ride is approaching 8 years old. It is still quite popular. The main reasons rides get retrofitted or upgraded are either a defect on opening, or a refresh to drive ridership to an older ride that is losing popularity.

There is no reason to throw any money at it at this point as there is unlikely to be any ROI.

It would be nice to see the parks invest in capacity and efficiency in their next attraction - however given WOZ, I don't know that they're interested in that. We may have to wait for a change of management \ ownership before the focus shifts.

Link to comment
Share on other sites

And for the first few years of operations Rivals never really had an issue with just two trains. In peak periods they operate both and in off-peak they operate with one. The dispatches were efficient which meant the queue would move quickly and there wouldn’t be stacking (or at least it would be minimal). Throwing more money at the ride to get a third train ain’t going to make things any better. Dispatches won’t be any quicker than either two trains. And yes having a third train will mean they always have at least two trains available, but what the park needs to do is have better management with their maintenance to ensure they always have the spare parts required and to never have the second train unavailable during those peak periods.

Village threw more money at Wizard of Oz to try make it better ($100 million if anyone needs reminding) and look how that’s turned out. Throwing money at things ain’t always the answer… take Dreamworld over the past 4 years for example.

Link to comment
Share on other sites

Join the conversation

You can post now and register later. If you have an account, sign in now to post with your account.
Note: Your post will require moderator approval before it will be visible.

Guest
Reply to this topic...

×   Pasted as rich text.   Paste as plain text instead

  Only 75 emoji are allowed.

×   Your link has been automatically embedded.   Display as a link instead

×   Your previous content has been restored.   Clear editor

×   You cannot paste images directly. Upload or insert images from URL.

 Share

  • Recently Browsing   0 members

    • No registered users viewing this page.

×
×
  • Create New...

Important Information

By using this site, you agree to our Terms of Use. We have placed cookies on your device to help make this website better. You can adjust your cookie settings, otherwise we'll assume you're okay to continue.