Jump to content

Steel Taipan Construction - Dreamworld Mack launched roller coaster

Blue Fire Feature 154 members have voted

  1. 1. What would you prefer?

Please sign in or register to vote in this poll.

Featured Replies

  • Replies 2.3k
  • Views 498.3k
  • Created
  • Last Reply

Top Posters In This Topic

Most Popular Posts

  • themagician
    themagician

    This morning I was invited out to Dreamworld to get a sneak peek of Steel Taipan and a walk through of the entire area. I’ll start out by saying, overall they’ve done a good job with the area. It’s ve

  • Retardent
    Retardent

    Occasionally I'll search through tender websites for theme park projects and yesterday's search at work had delivered some treasure. Here is what is worth noting: This is what the queu

  • And we have supports. 

Posted Images

Shouldn't be too much now.

After they finish the transition out of the airtime hill within the loop, all they'll need to do is the heartline roll and the turn into the brake run (then do the reverse twisted half pipe).

On 26/05/2021 at 2:24 PM, Brad2912 said:

Queue house construction is underway. 

AC5B0EDD-CD13-4185-8598-F23F151F9470.jpeg

5857542B-D73E-4FF4-B1F3-E342B3E2DAE3.jpeg

1BE9510D-A00D-4D1F-BB98-A30F2A540C0D.jpeg

Great pics! Isn't it standard practice that station/queue/theming commences after the track has been 100% assembled?

5 minutes ago, joz said:

How fast was the ride going?

Given M1 speed limit is 110, that's the fastest we'll ever see Steel Taipan get launched to. 😉

Also, agree with other comments. No need to jeopardise your own safety - forum reacts are just not worth it.

4 hours ago, CR4ZE said:

Isn't it standard practice that station/queue/theming commences after the track has been 100% assembled?

As long as what needs to be worked on isn't in the way I don't see any reason why they would delay something like that when they don't have a real reason too. If it means the ride is opening sooner I am all for them working on two things at once.

14 hours ago, CR4ZE said:

Great pics! Isn't it standard practice that station/queue/theming commences after the track has been 100% assembled?

As Pin said, as long as they're not in the way of construction and lifting, it's a non issue. I think though that this has been standard practice in Australia for a while. Overseas is a very different story, and it certainly gets it all together sooner.

Look at Universals construction of the velocicoaster, considering it’s scale, theming, extensive queue, testing and stopping during COVID lockdown, they built that very quickly. 
 

For Steel Taipan, they need to install all the track through the station and within close proximity before building the station. It makes access for vehicles much easier and safer 

  • Popular Post

Here’s a look at what’s left in the car park

1933A558-DD31-4359-AB98-44CF1BD2777F.thumb.jpeg.bfc2979f5474ae29473f82d4863231ca.jpeg

BD5DB9C7-6F93-4B7B-A003-65D3AB3C21A7.thumb.jpeg.abf044530ca8551172877b28bebfb4cf.jpeg

EA8400BB-71AC-4D1F-9AA5-9137A55A32F9.thumb.jpeg.1f05348d8685c90def9acd33639260d9.jpeg

8FF4F9E8-C62F-48C9-8B00-3237B4339F65.thumb.jpeg.864220b29ffdc083a3a5d187b8859418.jpeg

B3016AD4-559A-422E-81B4-7BC3C935B153.thumb.jpeg.6fba36464c465616be9e9d64bb7951cb.jpeg

C389D943-4CF3-4F06-A8CD-BC066B76728F.thumb.jpeg.8c9ea5326e618e79e230283edf9c2bf5.jpeg

08B04057-5ACC-49C8-94B3-792B2089F889.thumb.jpeg.884fd9361d8c5b5d12d479e67313ff9c.jpeg

Anyone know what this part is for?

874574B3-7C1A-464E-86E1-826196438386.thumb.jpeg.97feffb04f56e753eb8868c1d882a9d8.jpeg

Station update

25469968-FAD3-48C7-9631-9A1A75FFEEC8.thumb.jpeg.54cb40fa367dc4f8a680de8720f8d1b8.jpeg

BBCFE9B5-166C-41A2-AC08-7A69D5D6199C.thumb.jpeg.9f2a6d9ee6db841e18a7975111205ff7.jpeg

85391085-6177-4955-9162-5CD21CADFE8C.thumb.jpeg.00bf9c1a5991934565932c9f8a400801.jpeg

649366E3-C860-40F7-91E3-C3DC3500E972.thumb.jpeg.517f756c9ffe658b3220933d8b6cfbe6.jpeg

Do you think they’ll build a retaining wall along here for the train track? Because I’d imagine they would have removed it if they weren’t going to use it 958B3564-7724-4A2E-9D00-9203AC516218.thumb.jpeg.bbe371640b4ff1e2552bf43f1cb7d31a.jpeg

Track updates

D3450744-8F7E-40AD-AD29-9FB42CA5E431.jpeg

2B4E94E1-1987-4CBC-A095-09620582DC0F.jpeg

18147070-9FEE-43CB-BB16-AC350245EBBF.jpeg

A9388603-9E9C-4D62-A20A-48E144DE076C.jpeg

EF7E4626-16F0-499D-ACCB-9D4EFE3138DF.jpeg

991D80C6-ACD3-401C-BAAE-81FEBB8E36F0.jpeg

5FF930A9-E714-4D03-B9E8-9FC2500D09B7.jpeg

4A50BEEA-2B8F-4D2B-96F0-EE4A096A59ED.jpeg

D1ED7274-940C-4A81-BEDF-0F86EF24BFC9.jpeg

66154145-D51B-4875-8480-69045D6FAD70.jpeg

23313553-CD29-4A19-9AD3-1F47C80F14DC.jpeg

76F7E983-190A-4D4C-9A6B-308D81563720.jpeg

F0AD4207-CF09-4083-9C95-306425F7CC03.jpeg

On 29/05/2021 at 12:50 PM, themagician said:

Anyone know what this part is for?

874574B3-7C1A-464E-86E1-826196438386.thumb.jpeg.97feffb04f56e753eb8868c1d882a9d8.jpeg

Zoomed in, looks like maintenance track. There are hydraulic/pneumatic arms on the supports. Perhaps the white plastic blocks holds the car and the rails can swing away with the wheel assemblies?? Also the pointed ends on the rails would make it easier to slide wheel assemblies on as well. 

16 minutes ago, joz said:

I assume with this ride there are no tracks in the maintenance bay, and that's the last bit of track to get the coaster back onto the track smoothly. Looks pretty neat

Most newer Mack coasters have the little wheels under the body that supports the train, that allows the bogies to be easily accessed as they are no longer on the track. Is that what your thinking is the case here? 

I think there is a photo of the system somewhere in the DC Rivals thread. 

Edited by red dragin

11 hours ago, Im Hungry said:

Halfway down Page 170 of the DC Rivals thread has mentions of this bizarre red jig. Still no clear answer for what it's purpose is - only thoughts and assumptions.

And inadvertently you've found the post I was talking about ☺ https://www.parkz.com.au/forums/topic/7745-dc-rivals-hypercoaster-construction-discussion/?do=findComment&comment=152437

On 29/05/2021 at 12:50 PM, themagician said:

Here’s a look at what’s left in the car park

Do you think they’ll build a retaining wall along here for the train track? Because I’d imagine they would have removed it if they weren’t going to use it 958B3564-7724-4A2E-9D00-9203AC516218.thumb.jpeg.bbe371640b4ff1e2552bf43f1cb7d31a.jpeg

 

Remember, the train is being re-routed back to the station from Corroboree on the other side of Giant Drop. 
 

1816528822_ScreenShot2020-08-01at6_35_28pm.jpg.1e087a0edce013f5ed3d41698b5590b8.jpg

They'll sort the gradient out by linking back to the old track a lot closer to the station.

Guest
This topic is now closed to further replies.

Recently Browsing 0

  • No registered users viewing this page.

Important Information

By using this site, you agree to our Terms of Use. We have placed cookies on your device to help make this website better. You can adjust your cookie settings, otherwise we'll assume you're okay to continue.

Configure browser push notifications

Chrome (Android)
  1. Tap the lock icon next to the address bar.
  2. Tap Permissions → Notifications.
  3. Adjust your preference.
Chrome (Desktop)
  1. Click the padlock icon in the address bar.
  2. Select Site settings.
  3. Find Notifications and adjust your preference.