Everything posted by Aw hype
- 2025-2026 Christmas trading hours for the Gold Coast
- Movie World Maintenance Schedule 2025
- Dreamworld Express - will the full circuit come back?
- Wet’n’Wild - New Slides
-
USS - Expansion Minions and Nintendo
Damn...Didn't even realise they were adding another one! The Public transport is so good in Singapore that you can just about get anywhere. In saying that, if you have kids, it would be very convenient to just stay at mandai.
-
USS - Expansion Minions and Nintendo
We went recently. USS was spectacularly busy, but we still felt we got it all done quite easily in a day. The Bird Park and River Wonders are both half day ventures. The zoo you can stretch out to a whole day if you really wanted to, and the night safari is self explanatory. Both Waterparks are pretty shit and a half day each at most. Honestly, there is so much to do in Singapore. Amazing place.
- Dreamworld - Something big is coming
- Dreamworld - Something big is coming
- Movie World Maintenance Schedule 2025
-
Movie World Maintenance Schedule 2025
You can't reasonably have a grievance against the parks reducing their hours over Winter. It's a common sense business move. It Must just be because of the lack of competition making WnW stay open over Winter - similar to Maccas being 24 Hours but Hj's not. They cant be making money over there. All that being said, I'd rather be, as a consumer, at the 'experience is good and I feel Valued for 90 Minutes less' Place than the 'It's open longer, circa 40% of the rides are down at a given time, we wait in line more and get treated considerably worse' one. Lesser of two evils, but I'd rather of less of the good than more of the shit.
- Movie World Maintenance Schedule 2025
- Has Coast Entertainment given up on Whitewater world?
- Adventure World new ride 2025
-
Wizard of Oz - Movie World Arkham Asylum Replacement
It's almost as If they've just done the minimum requirement so as to not piss off whoever licensed them the IP. It's aesthetically pleasing and looks well done regarding the IP applications, then just screw you to guest experience. Someone mentioned the other day seeing village execs line cut opening morning. The arrogance to do that in front of paying guests, not to mention the stupidity of not having those things done behind closed doors (every park ever seems to let employees have rides before these things open) is unfortunately completely in character for the Current VRTP. Maybe the $100m figure is a total investment between Flash, Oz and SDSC, and they've tried to white lie their way into a headline? I'd hate to see how the colours in the area will hold up over the years in that harsh sun as the management decide gold-plate their office chairs instead of repainting. I really hope this tips the scales back in DW favour.
- Dreamworld Maintenance Schedule 2024
-
Movie World Scheduled Maintenance 2024
The odd 5 Minute dispatch due to guests piss farting around and not listening is Fine. There were periods were the train would sit empty for near on a minute, with no one getting off or on, while ops people were having a quick yarn about one thing or another. I don't blame those people specifically. Such low (comparitive to DW) work standards being deemed acceptable are a failure of management, not to mention the obvious lack of staff allocated to the rides.
-
Movie World Scheduled Maintenance 2024
WWF has been bang on. Absolute crock of shit. Spoke to various members over the parks in the last couple of days, inclusive WnW. They are very aware of the amount of school groups arriving over the next two weeks. They wouldn't set up big marquees and label them with individual school names on a whim and a prayer. It's gross what they're doing and getting away with as a business. The fact that the park is ultimately failing to deliver an advertised product and then blatantly lying to the high-paying customers they've ripped off is terrible. Second train is good when you don't have a crew stacking every second train for 2+ minutes.
-
Movie World Scheduled Maintenance 2024
We dropped into MW yesterday and today. SE was running one train at 3pm this afternoon, with a listed wait time of 30 Minutes. Low and behold, after 80ish minutes standing around, we got on. Such a shame that the ride ops only seemed to give a shit about how quickly things moved after the the line was shut, presumably to get home on time. Rivals was even worse yesterday. We bit the bullet and joined the 90 Minute line at 1215 yesterday, only to not be on until about 3. Staff seemed lethargic, uncaring, like they didn't want to be there, and were above all else slow. There also clearly was not enough of them to run things efficiently. 5 (and that's me being nice) Minute dispatches on your flagship attraction on any given day is deplorable, let alone with SE down and GL being as unreliable as it is. I will concede I Did not ride today so there could have been a better crew on. It's a stark contrast to how we saw things at DW. As much as lines were long, the place was organised, staff were working hard, friendly and actually looked like they cared about visitors and wanted to be there. The contempt that the Village seem to be treating the consumer with is disgusting - the fact that in an off peak time, I could only get on 4 things in a whole day is deplorable. The arrogance to do things like have a listed SE wait time on the app of 30 minutes yet close the line at 4pm is quite shocking (what is up with these clearly under-representing wait times?). I knew from on here Village were bad, but man the contrast between the places is insane. I really hope things turn around and trend Upward at DW with JR. They clearly care about and have a passion for visitors and their experiences at the park, where Village don't.
- Movie World Scheduled Maintenance 2024
- Jungle Rush Coaster
-
USS - Expansion Minions and Nintendo
Thats annoying, was hoping it'd at least soft open in time for my October trip. Absolutely no clue how they're going to fit all this in there is SFA space.
-
Top Thrill Dragster at Cedar Point "Closing"
Please just add the context or make a statement instead of annoyingly beating around the bush.
-
Top Thrill Dragster at Cedar Point "Closing"
Which has led to significant fatigue in the wheel bogies...I hope to be wrong but i think this may be a substantial closure with a re-design/re-engineer component.
-
Wizard of Oz - Movie World Arkham Asylum Replacement
From a bit of googling, a family boomerang in 2020 cost 4.5 Million AUD, and they got two of them. I recall Mark Shaw years ago saying on here that when you bring a coaster to Australia you essentially double it's cost due to our labour/material prices etc. I cant find any information about the SFC cost but i think it'd be fair to assume the 3 of them would cost somewhere around 25-30 Million AUD, although i reckon I'm going unders there. The Figure they spat out probably included the cost of AA demolition as well because you know big number good. When you consider Taipan cost 32 Million, it's a pretty good deal to cop 3 Coasters and a whole new themed area for only 50.
-
Movie World Scheduled Maintenance 2024
Indicative of a terrible work culture. I've come across many a shitty customer service workplace in my time, including places like Bounce. Some figure out their culture, making you feel supported, valued and leave you with a desire to come back irrespective of the crap you have to deal with. Others stink and make you want to quit. Minimum wage hospitality/service is always going to have seasonal recruitment drives for casuals (school holidays etc). Thats common sense. If they cant open rides during Winter, which they have before, because of a lack of staff, thats more of an indictment on the state of their workplace culture then any lack of wage or amount of crap they cop from guests.