Skip to content

Doomsday Destroyer - 2016 Movie World construction

Featured Replies

  • Replies 2.1k
  • Views 525.4k
  • Created
  • Last Reply

Top Posters In This Topic

Most Popular Posts

  • my spelling played up i mean latest more to come!

  • Theme Park Girl
    Theme Park Girl

    Latest piccies...  Annnd a video  

  • I don't understand why people are complaining about content. We've never had such comprehensive coverage of a new attraction before. Every member's contribution has been fantastic and is very much app

Posted Images

1 hour ago, The_Ninja_59 said:

image.jpeg

Thanks for the updates Ninja. I guess that framework behind the op booth confirms they are going to try and disguise the gap with more facade. good on them for following through!

I do hope they still plan to do something with the top white bar on showstage though.

9 hours ago, Theme Park Ninja said:

just left the park, no sign of testing :( oh well maybe next time

Well, it is the grand total of two and a half months until opening, you'll have plenty of time :)

Edited by XxMrYoshixX

6 hours ago, joz said:

It never really occurred to me, but that's a really long time till opening when the ride is (more or less) installed.

Big teases huh..

 

assuming their must be a long way to go theming wise and logistically the ride had to be in place before it could be done for site access reasons 

Better the ride is finished and solid than it gets to opening day and pulls a Lightning Rod

7 minutes ago, downunder said:

That's probably the most important bit to Movie World.

I wonder if they'll slap the dreaded locker tax on this one like Superman?

Nah. The lockers will be added to the new rollercoaster next year though. Can't really put them on a flat ride since you always end at the same location. But they will make sure the new coaster has 2 stations and add a gift shop at the exit and forced locker hire outside the shop.

Some from today. And yes, i am aware the last 2 are out of focus. Also looks like they have removed the 'bent steel' bits from behind the booth.IMG_1379.jpgIMG_1377.jpgIMG_1385.jpgIMG_1381.jpgIMG_1383.jpg

Was told by a staff member today that it will be a shop.

 

Do we know if this ride will have on-ride photos??

Edited by JaggedJanine

1 hour ago, Gary86 said:

Can't really put them on a flat ride since you always end at the same location. 

I know it isn't lockers, but it is bag storage separate to the ride itself - and could very well have been lockers instead of free storage:

  • The Claw
  • Wipeout
2 hours ago, AlexB said:

I know it isn't lockers, but it is bag storage separate to the ride itself - and could very well have been lockers instead of free storage:

  • The Claw
  • Wipeout

There might not be bag storage at all, I'm thinking riders will put their bags on the floor like on Tailspin, Giant Drop or the Freak Out travelling ride, since I don't believe Twin Hammers have moving floors like The Claw or Arkham Asylum. 

MW will put the locker tax on the new coaster however. Granted, that is quite obvious.

Join the conversation

You can post now and register later. If you have an account, sign in now to post with your account.
Note: Your post will require moderator approval before it will be visible.

Guest
Reply to this topic...

Recently Browsing 0

  • No registered users viewing this page.

Account

Navigation

Search

Search

Configure browser push notifications

Chrome (Android)
  1. Tap the lock icon next to the address bar.
  2. Tap Permissions → Notifications.
  3. Adjust your preference.
Chrome (Desktop)
  1. Click the padlock icon in the address bar.
  2. Select Site settings.
  3. Find Notifications and adjust your preference.