Jump to content

Theme Park Maintenance 2018


themagician
 Share

Recommended Posts

  • 2 weeks later...

If Dreamworld are closing HWSW for 6 months there better be a repaint somewhere down the pipeline and a cleanup of the theming, or a new control system is being installed. Surely it doesnt take that long to do some maintenance to a run of the mill Arrow looper.

Purely speculative thinking but maybe with the closure of the Peter Brock garage the naming rights deal with Hot Wheels may be running out and the park has to remove the Hot Wheels branding. It wasn't stated as to how long the naming rights would go for but I'd figure it would be for the same time as the lease for the Brock stuff.

Link to comment
Share on other sites

Plus remember that none of these three are 'backyard manufactured' in house. All are built by reputable amusement manufacturers with specific guidelines and requirements. Although Arrow isn't around these days i'm fairly certain S&S Sansei would be able to provide any ongoing support required.

  • Like 1
Link to comment
Share on other sites

Join the conversation

You can post now and register later. If you have an account, sign in now to post with your account.

Guest
Reply to this topic...

×   Pasted as rich text.   Paste as plain text instead

  Only 75 emoji are allowed.

×   Your link has been automatically embedded.   Display as a link instead

×   Your previous content has been restored.   Clear editor

×   You cannot paste images directly. Upload or insert images from URL.

Loading...
 Share

  • Recently Browsing   0 members

    • No registered users viewing this page.
×
×
  • Create New...

Important Information

By using this site, you agree to our Terms of Use. We have placed cookies on your device to help make this website better. You can adjust your cookie settings, otherwise we'll assume you're okay to continue.